| [1] |
JIANG Hua, WANG Zixiao, GUO Yongjian, GAN Congyu, LIU Hongzhi, SUN Shuliang.
Intelligent Monitoring of Rock Slag Volume in Slurry Shield Screening Based on Binocular-Vision Point Cloud
[J]. Tunnel Construction, 2026, 46(S1): 196-204.
|
| [2] |
YU Li, GUO Xiaohan, WANG Mingnian, LIU Yuan, LI Junqi.
Design of Evacuation and Rescue in Underwater Railway Shield Tunnels Based on Evacuation Psychology and operational safety
[J]. Tunnel Construction, 2026, 46(S1): 397-405.
|
| [3] |
ZHOU Chuanchuan, XIA Wenjie, WANG Jihong, JIANG Shuang, WANG Shugang, WU Yuanjin, LUO Zhanfu, LIU Qijun.
Optimal Deployment of CO Monitoring Sensors for Blasting Operations in Drill-and-Blast Tunnels
[J]. Tunnel Construction, 2026, 46(S1): 519-528.
|
| [4] |
LIN Chungang, LI Jielin, ZHOU Zhibin, YANG Chengye, ZHANG Danfeng.
Development of Intelligent Construction System and Its Management Platform for Railway Tunneling With Drilling and Blasting Method
[J]. Tunnel Construction, 2026, 46(9): 1846-1860.
|
| [5] |
LI Xu, DUO Shengjun, REN Chenning, WANG Huiwu, HUANG Pengli, ZHOU Mingliang.
Line Fitting for Emergency Repair of Tunnels Crossing Active Faults After Seismic Displacement Based on Objective Optimization Using Nondominated Sorting Genetic Algorithm Ⅱ
[J]. Tunnel Construction, 2026, 46(9): 2001-2010.
|
| [6] |
LIAN Jie, YANG Jixiang, TIAN Siming, XING Peigang, CHEN Xiwu, GUO Quan, SHI Zhengying.
Automated Recognition and Management System for Railway Tunnel-Construction Processes
[J]. Tunnel Construction, 2026, 46(6): 1208-1219.
|
| [7] |
YAN Xiao, ZHANG Yazhou, YAO Zhanhu, ZHANG Dongmei, ZHANG Lei, XU Mingyuan, ZHOU Wending, LIANG Yuqiang, LU Mingfei, LI Hui.
Comparison and Selection of Structural Schemes for Underground Shield Docking in High-Water-Pressure Saturated Sandy Stratum and Its Engineering Application
[J]. Tunnel Construction, 2026, 46(6): 1330-1341.
|
| [8] |
ZHANG Tian, FU Bingxian, GAO Yaming, NIU Yabin, ZHANG Lixia.
Prefabricated Composite Lining Structure for Reinforcing Railway Tunnel Linings and Its Construction Technology
[J]. Tunnel Construction, 2026, 46(5): 1121-1132.
|
| [9] |
TIAN Siming, ZHANG Yiteng, LI Shucai, LIU Dagang, LI Xu.
Construction and Intelligent Design of a High-Performance Active Support System for Railway Tunnels
[J]. Tunnel Construction, 2026, 46(4): 790-803.
|
| [10] |
ZHAO Xiaoyong, LI Guoliang, WANG Xindong, GAO Xinqiang, XIONG Wei, GUO Xiansuo.
Mechanical Properties of Prefabricated Inverted Arch Structures in Railway Tunnels During Construction
[J]. Tunnel Construction, 2026, 46(4): 828-839.
|
| [11] |
HOU Ye, YANG Chaoshuai, DING Yuxiang, HU Jie, LI Hongru, LI Xiaofeng, CAO Shuangli, HE Manchao.
Three-Dimensional Negative Poisson′s Ratio Active Support Systems for Rockburst Prevention and Control in Deep Tunnels
[J]. Tunnel Construction, 2026, 46(4): 852-868.
|
| [12] |
ZHAO Yong, TIAN Siming, GONG Jiangfeng, CAO Yong.
Statistical Analysis of Railway Tunnels in China by the End of 2025 and Achievements in the 14th Five-Year Plan Period
[J]. Tunnel Construction, 2026, 46(4): 877-892.
|
| [13] |
WANG Yanning, LI Taikai, MIN Xinhao.
State of the Art of Machine Learning in Tunnel Engineering
[J]. Tunnel Construction, 2026, 46(2): 233-245.
|
| [14] |
AI Wenkai.
Large Deformation Characteristics of Layered Rock Masses and Deformation Control of Asymmetric Support in High-Speed Railway Tunnels
[J]. Tunnel Construction, 2026, 46(2): 371-382.
|
| [15] |
WANG Shuaishuai, QIU Wenge, SHI Jingfeng, XU Yong, SUN Xiangdong, WANG Yongshi, CHEN Haozhe, DUAN Dongya.
Shrinkage Restraint Cracking Mechanism and Anticracking Optimization Measures for Lining of High-Altitude Tunnels
[J]. Tunnel Construction, 2026, 46(1): 168-182.
|