| [1] |
LEI Zhenghui, LI Yongliu, LIU Jinyan, LYU Peng, YAN Hongfu, TENG Keqin, WU Xiangguo, LU Lingwei.
Full-Scale Tests and Analysis on Flexural Behavior of Ultra-High Performance Concrete and Reinforced Concrete Composite Segment Joints for Metro Shield Tunnels
[J]. Tunnel Construction, 2026, 46(2): 287-300.
|
| [2] |
WANG Lei, YANG Zhe, DONG Shizhuo, SUN Changsong, WANG Heng, CHEN Honglei.
Key Technologies for Constructing Connecting Passages of Super-Large Diameter Shield Tunnels Using Artificial Freezing Method: A Case Study of Beijing East Sixth Ring Road Renovation Project
[J]. Tunnel Construction, 2025, 45(9): 1791-1802.
|
| [3] |
YANG Ping, WU Zhaoyang, YANG Qiongpeng, LI Wei, DING Yuhao.
Freezing Reinforcement and Rehabilitation of Tunnel
Damage due to Gushing Water and Sand During Shield Receiving
[J]. Tunnel Construction, 2025, 45(4): 804-815.
|
| [4] |
LI Ming, WANG Lei, CUI Hao, CHEN Honglei, SUN Changsong, YANG Zhe.
Interface Temperature Field of Freezing Method Construction for a Super-Large Diameter Shield Tunnel Connecting Channel: A Case Study of Beijing East Sixth Ring Renovation
Project
[J]. Tunnel Construction, 2025, 45(2): 352-360.
|
| [5] |
YAN Chao, YANG Ping, ZHANG Ting.
Freezing Rehabilitation Technology for Severe Segment Dislocation in Connecting Passages by Mechanized Methods
[J]. Tunnel Construction, 2025, 45(2): 392-401.
|
| [6] |
XU Fei, SU Zhenhai, DUAN Xuefeng.
Tunnel Lining Leakage Detection Method Based on Multi-Scale Fusion YOLO-B Algorithm
[J]. Tunnel Construction, 2025, 45(12): 2389-2400.
|
| [7] |
YE Yuhang, ZHANG Bangchao, BAI Haiwen, XU Wentian, LIU Xian, LAI Pengbang, DING Huidong.
Compression and Bending Mechanical Properties of Angular Drive Bolts in Segment Joints
[J]. Tunnel Construction, 2025, 45(11): 2053-2062.
|
| [8] |
WANG Xuejian, ZHANG Yuyu, JIANG Sili, WANG Jiayuan.
Risk Management and Platform Implementation of Shield Tunneling in Metro Engineering Based on Digital Twin
[J]. Tunnel Construction, 2025, 45(11): 2100-2116.
|
| [9] |
HE Tengfei, WANG Wenyuan.
Combined Application of Freezing Mining Method and Open-Cut Method in Underground Passage Engineering
[J]. Tunnel Construction, 2024, 44(S1): 418-426.
|
| [10] |
ZHANG Chengping, WANG Libin, TANG Haidong, PENG Hua, LI Yujie, NIU Xiaokai.
Study on Causes of Leakage
in Beijing Metro Shield Tunnel and Its Influence
on Segment Structure
[J]. Tunnel Construction, 2024, 44(S1): 456-466.
|
| [11] |
ZHANG Mingju, KANG Bo, LI Pengfei, PANG Yuekui, WANG Xijun, WU Hao.
Influence of Cross-Passage Construction Using Front-Traction
Pipe Jacking Method on Mechanical Properties of Metro
Shield Tunnel
[J]. Tunnel Construction, 2024, 44(6): 1165-1173.
|
| [12] |
SUN Feng.
In-situ Freezing-Temperature Field Monitoring
of a Metro Connecting Gallery With a Double-Sided Hole Arrangement in Qiantang River
[J]. Tunnel Construction, 2024, 44(6): 1214-1222.
|
| [13] |
GUO Yong, GUO Xiaolin, JIAN Yongzhou, ZHANG Jian, FENG Tugen, CHEN Zi′ang.
Identification and Prediction of Composite Ratios for
Strata in Metro Shield Tunnel
Using Artificial Bee ColonyBack Propagation Neural Network
[J]. Tunnel Construction, 2024, 44(3): 484-495.
|
| [14] |
YANG Ping, MAO Yixiang, YAO Mengwei.
Numerical Simulation of Influence of Liquid Nitrogen
Freezing Temperature Field and Parameters When Replacing
Shield Tail Brush
[J]. Tunnel Construction, 2024, 44(1): 69-77.
|
| [15] |
ZHANG Jinxun, JIANG Yusheng, YANG Hao, QI Yi, SONG Yongwei, JIANG Hua, YANG Zhiyong.
BasinShaped Freezing Technology for WaterRich Sandy Gravel Strata
[J]. Tunnel Construction, 2024, 44(1): 78-89.
|