[1] |
CHEN Jian, XUE Feng, SU Xiuting, LU Yao, LIU Tao.
Key Technologies of Cutterhead Configuration and
Cutter Replacement for Large diameter
Shield under High Water Pressure
[J]. Tunnel Construction, 2020, 40(7): 1057-1065.
|
[2] |
GONG Tingmin, JIA Lianhui, CHEN Wentao, ZHENG Yongguang.
Key Technologies of Hard Rock Slurry Balance Pipe
Jacking Machine for Composite Ground
[J]. Tunnel Construction, 2020, 40(6): 880-889.
|
[3] |
宋超业, 贺维国, 吴钇君.
高水压过海盾构隧道建设关键技术可行性初探
[J]. Tunnel Construction, 2020, 40(5): 717-726.
|
[4] |
陈伟乐, 宋神友, 金文良, 夏丰勇.
Plan and Practice of Intelligent Construction System of SteelConcreteSteel Composite Immersed Tunnel of ShenzhenZhongshan Link
[J]. Tunnel Construction, 2020, 40(4): 465-474.
|
[5] |
朱雁飞, 郭 彦, 潘伟强, 赵笑鹏.
自由断面管幕法在饱和软土地区桂桥路站地铁工程的应用
[J]. Tunnel Construction, 2020, 40(4): 552-561.
|
[6] |
GAO Jun, MENG Xiaowei, MA Longxiang, ZHANG Chao, LIU Jinchao.
Protection Schemes for Pipe Jacking Construction of Underpass Adjacent to Bridge in Soft Soils
[J]. Tunnel Construction, 2019, 39(S2): 234-241.
|
[7] |
XU Jinbin, WANG Feng, FU Cong, SONG Wei.
Combined Application of Cement System and Vertical Ground Freezing to Shield Receiving in Wuhan Metro
[J]. Tunnel Construction, 2019, 39(S2): 358-365.
|
[8] |
WANG Zhijie, TANG Li, JIANG Xinzheng, HOU Weiming, XU Haiyan, JI Xiaofeng.
Model Test on Stability of Large Crosssection Highway Tunnel Adjacent to Caverns
[J]. Tunnel Construction, 2019, 39(S1): 16-24.
|
[9] |
ZHAO Junjie, JIA Bin, ZHANG Dong, CAO Mingxing, LI Dewu.
Inverse Analysis of Physical and Mechanical Parameters of Alataoshan Tunnel Surrounding Rock Based on BP Neural Network
[J]. Tunnel Construction, 2019, 39(S1): 220-226.
|
[10] |
LUO Yizhou, GUO Xiaonong.
Experimental Study of Bending Performance of Aluminum Alloy Cavity Composite Member
[J]. Tunnel Construction, 2019, 39(S1): 227-234.
|
[11] |
TANG Jixin, WANG Qunmin, CHEN Wenhua, HUANG Jianghua, SUN Hao.
Application of Fiber Bragg Grating Sensing and Photoelectric Imaging Technology in Deep Metro Foundation Pit
[J]. Tunnel Construction, 2019, 39(S1): 361-368.
|
[12] |
CHEN Jianguo.
Comparison and Selection of Advance Reinforcement Schemes for Aeolian Sand Section of Eton Brack No.1 Tunnel on Geku Railway
[J]. Tunnel Construction, 2019, 39(S1): 377-384.
|
[13] |
YAO Yuxiang, LI Sheng, MA Li, WANG Huan, WANG Changdan.
Numerical Simulation of Reinforcement Load Reduction for Highfilled Opencut Tunnel Based on Particle Flow
[J]. Tunnel Construction, 2019, 39(9): 1461-1470.
|
[14] |
LI Guimin.
Key Technologies for Design and Construction of Huangshanshao Tunnel on LijiangShangrila Railway Crossing underneath Rockpile Section
[J]. Tunnel Construction, 2019, 39(9): 1494-1499.
|
[15] |
BU Kangzheng, ZHENG Xianchang, ZHANG Wanzhao, GUO Jinrui, SHEN Xiang.
Calculation Method for Displacement of Existing Doubletube Metro Tunnel under Composite Foundation Induced by Foundation Pit Excavation
[J]. Tunnel Construction, 2019, 39(5): 783-794.
|