Countermeasures for Collapse of Taoshuping Tunnel Crossing Waterrich Finesand Strata

ZHANG Xuewen   

  1. (LanzhouChongqing Railway Project Headquarters of China Railway Construction Bridge Engineering Bureau Group Co., Ltd., Lanzhou 730070, Gansu, China)
  • Received:2017-06-19 Revised:2017-11-13 Online:2018-02-20 Published:2018-03-19

Abstract:

Taoshuping tunnel, a Grade Ⅰ doubleline railway tunnel, crosses tertiary waterrich finesand strata. As a result of the poor diagenesis of finesand strata and bad selfstability when mixing water, the tunnel construction is difficult and the easily encountering of collapse is difficult to treat. In order to deal with the abovementioned problems and guarantee rapid construction of the Taoshuping # 3 Tunnel, the technology of "vacuum dewatering+doublelayer large pipe roof+small pipe roof+doubleside drift method" is discussed and summarized to provide reference for similar projects in the future.

Key words: LanzhouChongqing Railway, Taoshuping Tunnel, waterrich finesand strata, collapse treatment, construction technology, doublelayer large pipe roof, doubleside drift method