ISSN 2096-4498

   CN 44-1745/U

二维码

Tunnel Construction ›› 2018, Vol. 38 ›› Issue (3): 456-460.DOI: 10.3973/j.issn.2096-4498.2018.03.013

Previous Articles     Next Articles

Technology and Development of SupportStructure Integral Piperoofing Preconstruction Method for Underground Works

LI Jidong, YOU Xinhua, XIAO Longge   

  1. (China State Construction Engineering Corporation, Beijing 101300, China)
  • Received:2017-06-08 Revised:2017-11-14 Online:2018-03-20 Published:2018-04-11

Abstract:

The supportstructure integral piperoofing preconstruction method is new for underground works. The core idea of the method, permanent structure of metro station goes first and then fullface soil excavation, is different from the traditional one. The key technologies of the method include longdistance jacking of largediameter steel pipe, spatial cutting and welding of pipe roof and construction of reinforced concrete structure in small space. The practice shows that the method, which integrates reinforcement, support and main structure, can reduce the excavation and support process and temporary support, control the ground defromation effectively and guarantee good working environment.

Key words: underground work, piperoofing preconstruction, steel pipe, support

CLC Number: