Abstract:
It is urgent to develop automatic processing equipment for segment steel reinforcement cage of shield to solve the problems of large human input, unstable quality and high security risk when using artificial processing method. Based on the CZTZH1 project of ChangshaZhuzhouXiangtan Intercity Railway, the production process of steel reinforcement cage of shield segment lining and steel processing equipment system are systematically analyzed and studied; and then the design scheme and parameters of steel bar shearing, monolithic net forming, material storage and stereoscopic net welding and molding system module are determined; finally, the equipment manufacturing, engineering field application and optimization are completed, and an effective production line of segment reinforcement cage is formed. Thus the automatic and mechanized processing of steel reinforcement cage of shield segment lining is realized; the labor intensity is effectively reduced; the manufacturing security is improved, and the cage welding quality is controlled.
Key words: shield, segment, steel reinforcement cage, automatic processing, steel bar shearing, monolithic net forming, material storage, stereoscopic net forming
CLC Number:
U 455.3
WANG Baiquan. Design and Application of Automatic Processing Equipment for Segment Steel Reinforcement Cage of Shield Tunnel[J]. Tunnel Construction, 2018, 38(3): 468-473.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://www.suidaojs.com/EN/10.3973/j.issn.2096-4498.2018.03.015
http://www.suidaojs.com/EN/Y2018/V38/I3/468
Key Technologies of Cutterhead Configuration and Cutter Replacement for Large diameter Shield under High Water Pressure
Fullscale Experimental Study on Bending Performance of Segmental Joints of Large Crosssection Shield Tunnel under Pure Compressive Bending Condition
Launching and Receiving Technology of Large Crosssection Horseshoeshaped Shield Used in Baicheng Tunnel