[1] |
JIANG Lijie, WEN Yongliang, JIA Lianhui, CHEN Baozong, HE Fei.
Design and Analysis of a New TBM Propulsion System
with Small Turning Radius
[J]. Tunnel Construction, 2020, 40(7): 1081-1087.
|
[2] |
LIU Ze, WANG Yong, LI Xiaofeng, WU Zhihao.
Key Technologies for Type Selection and Application of
Doublemode TBM in Complex Geology of Sea Area
[J]. Tunnel Construction, 2020, 40(6): 868-872.
|
[3] |
SUN Haibo.
Key Technology of Main Drive Assembly and Inspection
Technology of Meshing Quality of Gear Pair during TBM Remanufacturing
[J]. Tunnel Construction, 2020, 40(6): 890-897.
|
[4] |
ZHANG Binrong, GUAN Huisheng, TAN Xiaofeng, LIAO Jiang, YANG Xiao, LI Xia.
Dynamic Model and Vibration Analysis of TBM Edge Disccutter
Based on MATLAB/Simulink
[J]. Tunnel Construction, 2020, 40(6): 833-839.
|
[5] |
WANG Mingyou, HOU Shaokang, LIU Yaoru, JIN Feng.
Influence of Backfill Grouting Compactness of TBM Pea-gravel on Supporting Effect
[J]. Tunnel Construction, 2020, 40(3): 326-336.
|
[6] |
DUAN Zhiwei, DU Lijie, LYU Haiming, WANG Jiahai, LIU Haidong, FU Yongming.
Real-time Identification Method of TBM Surrounding Rock Excavatability
Grade Based on Principal Component Analysis and BP Neural Network
[J]. Tunnel Construction, 2020, 40(3): 379-388.
|
[7] |
ZHU Pengjin, ZHAO Kanglin, XIAO Lixing.
Development and Application of Equipment for Lateral
Moving and Advancing without Load of TBM
[J]. Tunnel Construction, 2020, 40(3): 417-425.
|
[8] |
宋神友, 陈伟乐, 金文良, 夏丰勇, 付佰勇.
深中通道工程关键技术及挑战
[J]. Tunnel Construction, 2020, 40(1): 143-152.
|
[9] |
HAN Xiaoliang.
Case Study of Breaking off of Outer Sealing Ring of TBM Main Bearing
[J]. Tunnel Construction, 2019, 39(S2): 393-397.
|
[10] |
WANG Xu, MENG Lu, CHENG Desheng, LU Song.
Research and Application of Comprehensive Geophysical Methods for Quality Testing of Backfill Grouting behind Lining Segment of TBM Construction Tunnel
[J]. Tunnel Construction, 2019, 39(S1): 166-175.
|
[11] |
ZHANG Binrong, GUAN Huisheng, ZHAO Changsheng, WANG Mo.
Finite Element Simulation Analysis of Rock Breaking Test Platform for Dualmode TBM Cutter
[J]. Tunnel Construction, 2019, 39(S1): 290-295.
|
[12] |
SI Yudi.
Construction Technology of Doubleshield TBM Passing through Station in Urban Rail Transit Tunnel
[J]. Tunnel Construction, 2019, 39(S1): 411-419.
|
[13] |
李志鹏.
扎尕梁特长公路隧道通风方案比选研究
[J]. Tunnel Construction, 2019, 39(9): 1486-1493.
|
[14] |
WANG Haijun.
Application of Stepping without Load Technology of Open TBM to Songhua River Water Diversion Project
[J]. Tunnel Construction, 2019, 39(9): 1500-1506.
|
[15] |
LIU Feixiang, YU Yang.
TBM Technologies in Bad Geology of a Tunnel Project
[J]. Tunnel Construction, 2019, 39(9): 1515-1522.
|