Study of Measurement and Distribution Characteristics of Surrounding Rock Stress of Large Crosssectional Highspeed Railway Tunnel with Mechanized Construction
YU Li1, 2, WANG Zhilong1, 2, YANG Nie1, 2
(1. Key Laboratory of Transportation Tunnel Engineering, Ministry of Education, Southwest Jiaotong University, Sichuan 610031, Chengdu, China; 2. School of Civil Engineering, Southwest Jiaotong University, Sichuan 610031, Chengdu, China)
YU Li, WANG Zhilong, YANG Nie. Study of Measurement and Distribution Characteristics of Surrounding Rock Stress of Large Crosssectional Highspeed Railway Tunnel with Mechanized Construction[J]. Tunnel Construction, 2018, 38(8): 1303-1310.