[1] |
LIU Xuezeng, TANG Jing, SANG Yunlong, SHI Gang, LI Xuefeng.
Model Experimental Study on Influencing Mechanism of
Reverse Fault Stick-slip Dislocation on Cross-fault Tunnel
[J]. Tunnel Construction, 2020, 40(4): 481-489.
|
[2] |
FU Zhiqian, JIANG Yongtao, NIE Dafeng, HUA Yang, DONG Yucang.
Strength Degradation of Surrounding Rock at Inverted Arch of Tunnel under Coupling Action of Train Load and Groundwater
[J]. Tunnel Construction, 2019, 39(S2): 36-43.
|
[3] |
MA Xiangfeng, GONG Lun, ZHANG Zhixin, QIU Wenge, WANG Lichuan, ZHOU Shangjin.
Study on Tunnel Stress and Load-bearing Arch Effect during Excavation and Filling
[J]. Tunnel Construction, 2019, 39(S2): 185-191.
|
[4] |
ZHANG Jiangang, MENG Qingming, LI Wei, HE Chuan.
Mechanical Analysis of Segment Joints with Different Arrangement of Waterproof Sealing Gaskets
[J]. Tunnel Construction, 2019, 39(11): 1790-.
|
[5] |
ZHENG Yongbo, BAI Tinghui, LI Xiaojun.
Influence of Reinforcement Corrosion on Bending Mechanical Property of Longitudinal Joint in Shanghai Metro Shield Tunnel
[J]. Tunnel Construction, 2019, 39(11): 1823-.
|
[6] |
YANG Nie, LIU Dagang, WANG Mingnian, YU Li.
Safety Evaluation of Tunnel Primary Support Based on DeformationStructure Method
[J]. Tunnel Construction, 2019, 39(9): 1445-1452.
|
[7] |
ZHANG Junru, YAN Congwen, YE Lun, WANG Anhui, ZHAO Zijing, FENG Jimeng.
Analysis of Mechanical Effect of Box Culvert Jacking on Bottom Pipe Curtain
[J]. Tunnel Construction, 2019, 39(S1): 73-79.
|
[8] |
XIONG Haoxiang, XU Qingshuang, REN Hui.
Investigation on Jacking Force Parameters of Curved Piperoofing Construction in Gongbei Tunnel
[J]. Tunnel Construction, 2019, 39(S1): 146-151.
|
[9] |
LI Zhihao, XIONG Ziming, LIU Yiming, LU Hao.
Threedimensional Cracks Simulation and Connectivity Analysis of Rock Mass Based on Longitudinal Cracks Correction
[J]. Tunnel Construction, 2019, 39(S1): 274-283.
|
[10] |
YIN Li, SHI Lingna, LIU Zhenyi, ZHANG Long.
Application of Tunnel Lighting Safety and Energy Saving Technology Based on Luminescent Reflective High Performance Coatings
[J]. Tunnel Construction, 2019, 39(S1): 327-333.
|
[11] |
JIANG Tonghu, SHEN Hongbo, WANG Guangyu.
Design of Twintube Complementary Ventilation Scheme for Xinchang Extralong Highway Tunnel
[J]. Tunnel Construction, 2019, 39(S1): 334-339.
|
[12] |
DONG Zhengfang, SHI Chengli, WANG Junjie, ZENG Fankai.
Influence of Gravity on Seismic Response of Underground Structures in Soil
[J]. Tunnel Construction, 2019, 39(4): 576-583.
|
[13] |
PENG Jiaqiang, ZHONG Xiaochun, WANG Qi, GAN Penglu.
Analysis on Shaking Table Experiment forShield Tunnel through Liquefied Foundation
[J]. Tunnel Construction, 2018, 38(S2): 60-67.
|
[14] |
YI Lingbing, LIU Peng, DU Mingfang, LYU Gaole, WANG Ximei, LIU Shenghuan, ZHENG Weifeng, LI Shuaibing, LYU Zhaolong.
Influences of Underground Excavation Section on Highspeed Railway Bridge: a Case Study of Beijing New Airport Line under Crossing Beijing Superlarge Bridge of BeijingShanghai Highspeed Railway
[J]. Tunnel Construction, 2018, 38(S2): 126-135.
|
[15] |
CHEN Bin.
Mining Excavation Technology for Superlarge Crosssection Transition Section of Badaling Great Wall Station
[J]. Tunnel Construction, 2018, 38(S2): 261-267.
|