Tunnel Construction ›› 2018, Vol. 38 ›› Issue (S2): 345-350.DOI: 10.3973/j.issn.2096-4498.2018.S2.047
Previous Articles Next Articles
BIAN Pengfei1, REN Hao1, *, WANG Shangao2
Received:
Revised:
Online:
Published:
Abstract:
In the course of tunnel invert construction, the construction quality is hard to be guaranteed due to the simple traditional equipment and backward technology; the passing pedestrians, vehicles and mechanical equipment are impassible during the invert processes of excavating and slag discharging; and the existing invert construction equipment for the existing passenger dedicated line tunnels are with low mechanization and integration degree. In order to solve these problems, taking the Guizhou Section CKGZTJ3 of Donglianganpo tunnel in ShanghaiKunmming Passengerdedicated line as example, the invert trestle, formwork system and walking mechanism are studied. The fully automatic hydraulic trestle invert mobile formwork machine are developed with the integration of trestle, invert formwork, central ditch formwork, walking mechanism, hydraulic and electrohydraulic devices and other structural parts. In the construction process, the invert construction area should be optimized firstly. The trestle walking, invert and central ditch formwork installation and location can be controlled by adopting fully automatic hydraulic and electrohydraulic system functions. During invert construction, the passing pedestrian, vehicles, mechanical equipment and palm surface construction have no interference with one another. The fully automatic hydraulic trestle type invert mobile formwork frame machine effectively reduces the input of operators and auxiliary materials, improves the work efficiency, controls the safe step distance, and ensures the lining and filling of invert and the quality of the central ditch.
Key words: tunnel, fully automatic hydraulic trestle, inverted mobile formwork, integrated machine, formwork, invert construction
CLC Number:
U 455.3
BIAN Pengfei, REN Hao, WANG Shangao. Research on Integratedmachine Construction Technology of Fullyautomatic Hydraulic Trestlebridgetype Inverted Mobile Formwork[J]. Tunnel Construction, 2018, 38(S2): 345-350.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://www.suidaojs.com/EN/10.3973/j.issn.2096-4498.2018.S2.047
http://www.suidaojs.com/EN/Y2018/V38/IS2/345
Key Technologies of Cutterhead Configuration and Cutter Replacement for Large diameter Shield under High Water Pressure
Experimental Effect Prediction of Ground Conditioning of Water rich Sandy Stratum Based on BP Neural Network
Fullscale Experimental Study on Bending Performance of Segmental Joints of Large Crosssection Shield Tunnel under Pure Compressive Bending Condition
Study on Optimization of Emergency Rescue Station of Yuntunbao Tunnel on ChengduLanzhou Railway
Launching and Receiving Technology of Large Crosssection Horseshoeshaped Shield Used in Baicheng Tunnel
Design and Analysis of a New TBM Propulsion System with Small Turning Radius
Study on Key Technologies and Application of Engineering Big Data Management Platform of Tunnel Boring Machine
Improvement Technology of Bearing Capacity of Prestressed Anchor Cable in Large span Tunnel: a Case Study on Badaling Great Wall Station