In order to improve the mechanization level of arch frame construction of primary support in the early stage of fullface and microbench excavation of large crosssection weak surrounding rock tunnel, the threeboom arch mounting trolley is introduced. The parameters, properties and construction technology of the theeboom arch mounting trolley are analyzed, and comparison of applicable effect between the trolley and the traditional one is made. Some conclusions are drawn as follows: (1) The grapping and connecting arches of the trolley can effectively shorten the arch mounting time without hurting operates. (2) The steel arch installation process is more standardized, which can effectively improve the installation accuracy and quality of the arch. (3) Comparing to the traditional arch mounting equipments, the threeboom arch mounting trolley is more suitable for the arch frame construction of primary support of large crosssection soft surrounding rock tunnel by microbench and fullface excavation methods. (4) The trolley can also assist in the construction of some tunnels at high altitude.
Key words: tunnel, microbench, large crosssection, full face, weak surrounding rock, threeboom arch trolley
CLC Number:
U 456.3
YANG Wenlong. Application of XM1200 Threeboom Arch Trolley to Construction of Large Crosssection Tunnel with Weak Surrounding Rocks[J]. Tunnel Construction, 2018, 38(S2): 351-357.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://www.suidaojs.com/EN/10.3973/j.issn.2096-4498.2018.S2.048
http://www.suidaojs.com/EN/Y2018/V38/IS2/351
Key Technologies of Cutterhead Configuration and Cutter Replacement for Large diameter Shield under High Water Pressure
Experimental Effect Prediction of Ground Conditioning of Water rich Sandy Stratum Based on BP Neural Network
Fullscale Experimental Study on Bending Performance of Segmental Joints of Large Crosssection Shield Tunnel under Pure Compressive Bending Condition
Study on Optimization of Emergency Rescue Station of Yuntunbao Tunnel on ChengduLanzhou Railway
Launching and Receiving Technology of Large Crosssection Horseshoeshaped Shield Used in Baicheng Tunnel
Design and Analysis of a New TBM Propulsion System with Small Turning Radius
Study on Key Technologies and Application of Engineering Big Data Management Platform of Tunnel Boring Machine
Improvement Technology of Bearing Capacity of Prestressed Anchor Cable in Large span Tunnel: a Case Study on Badaling Great Wall Station