ISSN 2096-4498
CN 44-1745/U
Tunnel Construction ›› 2019, Vol. 39 ›› Issue (5): 795-801.DOI: 10.3973/j.issn.2096-4498.2019.05.011
Previous Articles Next Articles
LIU Shuyan
Received:
Revised:
Online:
Published:
Abstract:
The transfer design of underground twofloor doubleline metro tunnel with same platform is characterized by high cost, large space waste, limited transfer proportion, multiple intersections in front and back of the station section, inconvenient crosspassage setting and high construction risk. Hence, 3 schemes of different spacings between right central line and left central line, 5 m, 9 m and 12 m, are put forward and compared, in which the spacing of 12 m is the optimum and can be used as equipment room or transfer platform; meanwhile, rational layout scheme of right line and left line should be determined according to the actual transfer passenger flow. The case study results show that by adopting the abovementioned scheme, the sections ahead of and behind the station can be bored by shield, no vertical connection gallery should be constructed, the length of opencut station can be shortened, and the cost, atgrade intersection of section and construction risk can be reduced; the transfer proportion can be increased by adding transfer platforms.
Key words: metro station, transfer scheme of underground twofloor doubleline metro tunnel with same platform, scheme comparison and selection, comprehensive cost, transfer proportion
CLC Number:
U 452.2
LIU Shuyan. Transfer Scheme of Underground Twofloor Doubleline Metro Tunnel with Same Platform[J]. Tunnel Construction, 2019, 39(5): 795-801.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://www.suidaojs.com/EN/10.3973/j.issn.2096-4498.2019.05.011
http://www.suidaojs.com/EN/Y2019/V39/I5/795
Application of Shield Receiving in Ultra-Deep Foundation Pit Without Main Structure: A Case Study of Dashadong Station of Gungzhou Metro Line 7
Mounting Technology for Steel Brace in Deep Foundation Pit of Metro Station Constructed by Semi-Cover Excavation Method: A Case Study
on Liuyanjing Station of Metro Line 3 in Nanchang, China
Construction Scheme and Mechanical Properties of a Prefabricated Metro Station Constructed by TwinTube Closely Spaced PipeJacking Method
Research and Application of PipeRoof Support Technology for Mined Metro Stations with UltraShallowBuried PipeRoof Cover Method:
a Case Study of Ping′anli Station of Beijing Metro Line 19
Integrated Construction Scheme of Municipal Bridges and Metro Stations Considering Geological Condition: a Case of University City South Station in Chongqing
Stress Characteristics of ConcreteFilled Steel Tubular Column and Surface Deformation in PileBeamArch Station with Different RiseSpan Ratios of Arch:
a Case Study of Xiangheyuan Station on Beijing Metro Line 17
Comparative Analysis of Internal Forces of Prefabricated and CastinPlace Metro Station Structures under Horizontal Earthquake
Research and Application of Prefabricated Structure Construction Technology for Metro Station