ISSN 2096-4498
CN 44-1745/U

Tunnel Construction ›› 2019, Vol. 39 ›› Issue (7): 1141-1146.DOI: 10.3973/j.issn.2096-4498.2019.07.010
Previous Articles Next Articles
ZHENG Xin1, 2, GUO Chun1, 2, *, WANG Xin1, 2, WANG Shuaishuai1, 3
Received:
2019-03-07
Revised:
2019-05-09
Online:
2019-07-20
Published:
2019-07-31
CLC Number:
ZHENG Xin, GUO Chun, WANG Xin, WANG Shuaishuai. Evaluation on Labor Intensity of Workers in Guigala Highaltitude Tunnel[J]. Tunnel Construction, 2019, 39(7): 1141-1146.
Add to citation manager EndNote|Ris|BibTeX
URL: http://www.suidaojs.com/EN/10.3973/j.issn.2096-4498.2019.07.010
Viewed | ||||||
Full text |
|
|||||
Abstract |
|
|||||
Support by Beijing Magtech Co.ltd support@magtech.com.cn