Innovative Design and Application of Caiyun TBM to Gaoligongshan Railway Tunnel

XIE Chengtao1, ZHAO Hailei1, 2   

  1. (1. China Railway Tunnel Group Co., Ltd., Guangzhou 510000, Guangdong, China; 2. State Key Laboratory of Shield Machine and Boring Technology, Zhengzhou 450001, Henan, China)
  • Received:2019-01-25 Revised:2019-04-22 Online:2019-07-20 Published:2019-07-31

Abstract:

Gaoligongshan Tunnel, as a key control project of DaliRuili Railway, is characterized by three highs and four actives. During TBM construction, disasters such as fault fracture zone, mud gushing, rock burst, etc., would be encountered. As a result, the variable crosssection lifting excavation method is adopted for the main tunnel TBM design; and as well, some innovative technologies, i.e. preautomatic concrete spraying, concealed and normalized advance drilling and waterrock integration advance prediction, are used. The construction practice shows that the innovative designs of TBM have played a significant role in the excavation process and can provide reference for the design and application of TBM to similar geological conditions in the future.

Key words: Gaoligongshan Railway Tunnel, TBM, variable crosssection lifting, automatic concrete spraying, concealed advance drilling rig, advance prediction of waterrock integration