Tunnel Construction ›› 2020, Vol. 40 ›› Issue (10): 1533-1539.DOI: 10.3973/j.issn.2096-4498.2020.10.018

Previous Articles     Next Articles

Research on Construction Risks and Countermeasures of Piperoof Undercutting Method in Saturated Soft Soil

ZHAO Xiaopeng   

  1. (Shanghai Tunnel Engineering Co., Ltd., Shanghai 200232, China)
  • Online:2020-10-20 Published:2020-11-01

Abstract: The traditional underground excavation method can hardly be applied to the saturated soft soil with high water content and low bearing capacity, while the piperoof undercutting method provides a new way for soft soil excavation construction. At present, the design and construction experience of piperoof undercutting method are not mature, which leads to great difficulty. The risk control is particularly important during construction. Hence, based on the engineering practice of the piperoof section of Guiqiao Road Station on Shanghai Metro Line No. 14, some risk factors such as advancing precision of piperoof, MJS reinforced underground pressure control, lining wall overturning, melting and grouting, collapse and water gushing during excavation are discussed from the perspective of risk control, and the corresponding countermeasures are put forward. The analytical results show that: (1) It is feasible to construct large crosssection underground space by piperoof undercutting method in soft soil, and the construction risk is generally controllable. (2) The jacking process is the basis for the implementation of piperoof undercutting method, the process of excavation and support is the key process for the construction risk control and also the main factor causing ground subsidence.

Key words: tunneling engineering, piperoof undercutting method, construction risks, countermeasures, saturated soft soil