ISSN 2096-4498
CN 44-1745/U

ISSN 2096-4498
CN 44-1745/U
Tunnel Construction ›› 2020, Vol. 40 ›› Issue (11): 1649-1656.DOI: 10.3973/j.issn.2096-4498.2020.11.014
Previous Articles Next Articles
Transformation, Assembling and Construction Technology of Open Pipe Jacking Machine to Slurry Balanced Pipe Jacking Machine in Tunnel:
a Case Study on Shenzhen 110 kV Overhead Line Transformation into Ground Cable Tunnel Project
DONG Zhiwei1, DING Xiaobin2, *, YANG Yongqiang1, ZHANG Chao2
(1. The 2nd Engineering Co., Ltd. of China Railway Tunnel Group, Sanhe 065201, Hebei, China; 2. School of Civil Engineering and Transportation, South China University of Technology, Guangzhou 510641, Guangdong, China)