ISSN 2096-4498

   CN 44-1745/U

二维码

Tunnel Construction ›› 2020, Vol. 40 ›› Issue (12): 1775-1780.DOI: 10.3973/j.issn.2096-4498.2020.12.012

Previous Articles     Next Articles

Economic Analysis on Large Crosssectional Mechanized Construction of Soft Rock Railway Tunnel

WU Wei1, QIN Weihua1, LUO Fujun2   

  1. (1. China Railway Economic and Planning Research Institute Co., Ltd., Beijing 100038, China; 2. China Railway Eryuan Engineering Group Co., Ltd., Chengdu 610031, Sichuan, China)

  • Online:2020-12-20 Published:2021-01-03

Abstract: The influencing factors and their influencing degree of economy of large crosssectional mechanized construction of soft rock railway tunnel are of great significance. As a result, the construction quantities of two mechanized construction design drawings, i.e. the large crosssectional mechanized construction and conventional mechanized construction(bench method) of soft rock tunnel of ZhengzhouWanzhou Highspeed Railway, are introduced, and three sets of budgeting schemes are established from aspects of quantity optimization and technology variation based on existing railway cost standard and partial unit price analysis on large crosssectional mechanized construction of soft surrounding rock. The research results show that: (1) The advance reinforcement is the main economic affecting factor of large crosssectional mechanized construction. (2) Compared with the conventional mechanized construction method, the budgeting index per meter of large crosssectional mechanized construction in Grade Ⅳa, Ⅳb and Ⅴa surrounding rocks increases by -9.41%, 10.81% and 6.24% respectively; and the monthly advance of large crosssectional mechanized construction in Grade and surrounding rocks increases by 9.33% and 22.22% respectively, which shows obvious economy.

Key words: railway tunnel, soft surrounding rock, large crosssection, mechanized construction, economy, construction quantity, construction method

CLC Number: