[1] |
FANG Junbo, LIU Hongzhen, MA Liuchuang.
Tunnel Overbreak Control Technology by Rock drilling
Jumbo with Long and Short Blasting Holes
[J]. Tunnel Construction, 2020, 40(11): 1642-1648.
|
[2] |
JIA Lianhui, LYU Dan, ZHENG Kangtai, XIAO Wei, FENG Lin.
Research and Test on Vertical Discharge of Fullface
Shaft Boring Machine
[J]. Tunnel Construction, 2020, 40(11): 1657-1663.
|
[3] |
DONG Zhiwei, DING Xiaobin, YANG Yongqiang, ZHANG Chao.
Transformation, Assembling and Construction Technology
of Open Pipe Jacking Machine to Slurry Balanced Pipe Jacking
Machine in Tunnel:
a Case Study on Shenzhen 110 kV Overhead Line
Transformation
into
Ground Cable Tunnel Project
[J]. Tunnel Construction, 2020, 40(11): 1649-1656.
|
[4] |
TAN Shunhui.
Development and Application of Multifunctional and
Intelligent Tunnel Boring Machine
[J]. Tunnel Construction, 2020, 40(9): 1243-1250.
|
[5] |
WANG Xulong, ZHU Ye.
Coupled Vibration Analysis of Fullface
TBM Main Body Based on ADAMS
[J]. Tunnel Construction, 2020, 40(9): 1300-1306.
|
[6] |
CHEN Yanan, CHEN Liangwu, ZHAO Lei, MA Lin.
Detection and Cause Analysis of Main Drive Seal
Failure of Shield
Machine
[J]. Tunnel Construction, 2020, 40(S1): 419-422.
|
[7] |
ZHAO Hailei, SUN Zhenchuan, ZHANG Bing, WANG Yafeng, YANG Yandong, QIN Yinping, LI Hongbo.
Research on Correlation of Key Parameters of TBM Cutter
Head Based on Improved CSM Model
[J]. Tunnel Construction, 2020, 40(S1): 169-178.
|
[8] |
LI Ligong, JIANG Dongpeng, LIN Chungang, YANG Junhua.
Development and Application of Intelligent Tunnel
Lining Trolley with Automatic Concrete Distribution and
Pressure Casting
[J]. Tunnel Construction, 2020, 40(8): 1211-1220.
|
[9] |
YANG Dongjian, ZHUO Puzhou, GUO Zhenggang, MENG Zhichao, BAI Liang, HUO Junzhou.
Design and Experimental Research of TBM Integrated
Cutter System
Based on Robot Operation
[J]. Tunnel Construction, 2020, 40(8): 1236-1242.
|
[10] |
LI Jie, ZHANG Xin, MA Chao, YANG Long, GUO Jingbo.
Analysis and Experimental Research on Synchronous
Performance of Segment Erector Lifting System
[J]. Tunnel Construction, 2020, 40(7): 1072-1080.
|
[11] |
JIANG Lijie, WEN Yongliang, JIA Lianhui, CHEN Baozong, HE Fei.
Design and Analysis of a New TBM Propulsion System
with Small Turning Radius
[J]. Tunnel Construction, 2020, 40(7): 1081-1087.
|
[12] |
GONG Tingmin, JIA Lianhui, CHEN Wentao, ZHENG Yongguang.
Key Technologies of Hard Rock Slurry Balance Pipe
Jacking Machine for Composite Ground
[J]. Tunnel Construction, 2020, 40(6): 880-889.
|
[13] |
LI Yabo, LI Jing.
Design of Lshaped Joint Concrete Lining
Formwork Trolley
[J]. Tunnel Construction, 2020, 40(6): 898-904.
|
[14] |
SUN Haibo.
Key Technology of Main Drive Assembly and Inspection
Technology of Meshing Quality of Gear Pair during TBM Remanufacturing
[J]. Tunnel Construction, 2020, 40(6): 890-897.
|
[15] |
SUN Zhenchuan, LI Fengyuan, CHU Changhai.
Analysis Method of Correlation between Shield Tunneling and Geology Based on Big Data
[J]. Tunnel Construction, 2020, 40(2): 162-169.
|