| [1] |
CUI Shankun, SUN Sanxiang, ZHENG Xuting, LI Lei.
Impact of Leakage in Pressurized Ventilation Ducts on Diffusion of CO Concentration in Tunnels
[J]. Tunnel Construction, 2025, 45(S2): 249-257.
|
| [2] |
JIANG Yajun, ZENG Yaoyi, CAO Danyang, WANG Haizhou, HOU Kaile.
Conceptual Model of Operational Tunnel Leakage Based on Karst Groundwater Movement
[J]. Tunnel Construction, 2025, 45(S2): 390-400.
|
| [3] |
JIANG Xuepeng, GUO Yuanjun, ZHANG Xiaoning, GUAN Honghao.
Installation Position of Ventilation Relay Duct in
Long-Distance Tunnel: A
Case Study on Hefei-Wuhan High-Speed
Railway Tunnel
[J]. Tunnel Construction, 2025, 45(5): 955-963.
|
| [4] |
LI Dawei, ZHONG Xiaochun, LIU Chang, SHEN Guili, ZHONG Jianling, HUANG Siyuan.
Numerical Model and
Validation of Leakage for Multi-Chamber Sealing System of a Shield Tail Brush
[J]. Tunnel Construction, 2025, 45(2): 304-314.
|
| [5] |
XU Fei, SU Zhenhai, DUAN Xuefeng.
Tunnel Lining Leakage Detection Method Based on Multi-Scale Fusion YOLO-B Algorithm
[J]. Tunnel Construction, 2025, 45(12): 2389-2400.
|
| [6] |
ZHANG Mingju, XIANG Yang, LI Pengfei, HE Haijian, XU Qing.
A Fuzzy Comprehensive
Evaluation System for Metro Leakage Incorporating Combination Weighting and Its Application
[J]. Tunnel Construction, 2024, 44(S2): 61-72.
|
| [7] |
LIU Xian, SUN Qihao, FAN Sen, SHU Jicheng.
Sealing Mechanism of
Polyurethane for Leakage During Shield Tunneling
[J]. Tunnel Construction, 2024, 44(S1): 82-91.
|
| [8] |
ZHANG Chengping, WANG Libin, TANG Haidong, PENG Hua, LI Yujie, NIU Xiaokai.
Study on Causes of Leakage
in Beijing Metro Shield Tunnel and Its Influence
on Segment Structure
[J]. Tunnel Construction, 2024, 44(S1): 456-466.
|
| [9] |
SUN Qihao, FAN Sen, LIU Xian.
Experimental Study on
Leakage Sealing Mechanism of Slurry in Shield Tunnels
[J]. Tunnel Construction, 2024, 44(8): 1632-1642.
|
| [10] |
HONG Zequn, FU Shuoren, SHI Rongjian, ZHANG Yong, LU Lu, SUN Meng, QIU Peiyun.
Analytical Study of SteadyState
Temperature Field of Local -Freezing and Water Sealing
in Foundation Pit Engineering
[J]. Tunnel Construction, 2024, 44(1): 116-125.
|
| [11] |
GENG Tianshuang, ZHANG Jing, ZHAO Jiling, YANG Ping, HE Wenlong.
Metro Jet System and Horizontal Freezing Construction
at Zhongsheng Station of Nanjing
Metro Line 7 Closely Crossing Underneath an Operation Station
[J]. Tunnel Construction, 2024, 44(1): 172-180.
|
| [12] |
YAN Liangtao, QI Yanqiu.
Key Technologies for Prevention and Control of Water
Leakage and Sand Gushing Risk in Underwater Deep
Buried Frozen Drilling Hole
[J]. Tunnel Construction, 2022, 42(S2): 435-439.
|
| [13] |
NIU Ruoxin, DONG Haizhou.
Experimental and Numerical Simulation of PumpingTracing
Method for Detecting Leakage in Underground Diaphragm
Wall
[J]. Tunnel Construction, 2022, 42(11): 1889-1897.
|
| [14] |
AN Jianyong, LEI Haibo, YIN Hongwei, LIU Zeliang, JIN Xin, YANG Ning, GUAN Xiaoming.
Safety Control Technology for UltraSmall
Clear Distance Overlapping Shield Tunnel Construction
in WaterRich Sandy Stratum
[J]. Tunnel Construction, 2021, 41(S2): 503-511.
|
| [15] |
LU Yaobang, LIU Yongsheng, FAN Xiaodong.
Rapid Detection Method for Surface Defect for Metro
Tunnel Structure and Its Application
[J]. Tunnel Construction, 2021, 41(S2): 655-663.
|