ISSN 2096-4498
CN 44-1745/U
ISSN 2096-4498
CN 44-1745/U
Tunnel Construction ›› 2020, Vol. 40 ›› Issue (S1): 258-265.DOI: 10.3973/j.issn.2096-4498.2020.S1.033
Previous Articles Next Articles
Risk Management in Early Stage of Connection Gallery with Freezing Method: a Case Study on Freezing Project of Superlong Connection
Gallery and Pump Station on Ziyang StationWuliting Station of Fuzhou Rail Transit Line 2
WANG Shulei1, GUAN Panfeng1, DING Guosheng2