Comparison and Selection of Construction Methods for Singlelayer Mined Station in Silty Sand Stratum

NIU Bin, HAN Congcong, GUO Ting, ZENG Deguang   

  1. (Beijing Urban Construction Design & Development Group Co., Limited, Beijing 100037, China)
  • Online:2020-08-30 Published:2020-09-15

Abstract: In order to study the ground settlement law during the construction of the singlelayer mined station in silty sand layer by columnhole method, the method of grouting test, numerical analysis and onsite monitoring and measurement are combined and adopted. The problems in design and construction of columnhole method in silty sand layer are analyzed, and an optimized design method is put forward. The results show that: (1) The grouting reinforcement can significantly improve the moisture content, cohesion, internal friction angle and compression modulus of silty sand layer. (2) The ground settlement and settlement groove induced by columnhole method are large in silty sand layer. (3) Problems such as narrow construction space, large sidespan construction settlement, and difficulty in comprehensive grounding construction exist in columnhole method construction. (4) The optimized singlelayer mining construction scheme are characterized by small settlement, mechanized construction, time saving and convenient construction.

Key words: mined station, columnhole method, silty sand, grouting test, numerical simulation, monitoring