| [1] |
FENG Tugen, YUE Chenlong, ZHANG Jian, HU Jinjian, XUE Xinkai, ZHENG Bin.
Performance Improvement of Shield Tunneling by Integrating Machine Learning and Multi-Objective Optimization
[J]. Tunnel Construction, 2026, 46(S1): 67-77.
|
| [2] |
FU Hainan, ZHOU Xiong, YANG Jiangbo, LIU Xiaoyang, CAI Hao.
Integration of Machine Learning for Prediction and Intelligent Parameter Design in Shield Tunneling Muck Conditioning
[J]. Tunnel Construction, 2026, 46(S1): 283-293.
|
| [3] |
WANG Shilong, GAO Baobin, WANG Xinzhuang, CAO Yongjing, ZHANG Changjuan, YANG Dongjie.
Cutterhead Jamming Mechanism and Prevention Strategy for an Open-Type TBM Crossing Collapse Columns
[J]. Tunnel Construction, 2026, 46(S1): 348-360.
|
| [4] |
LIU Qingzheng YANG Yandong, LU Gaoming, YAN Renfu, ZHANG Yongming, ZHU Xiaoliang, LI Enlei, LIU Wenshuai, WANG Junli, LIU Qiang, YAO Xiaomin, ZHAI Chaojie.
Optimization of Advance Pipe Roof Support Parameters for TBM Tunnels Based on Response Surface Methodology and Genetic Algorithms
[J]. Tunnel Construction, 2026, 46(S1): 443-455.
|
| [5] |
QI Mengxue, XIA Yimin, LI Fengwei, ZHOU Yanling, ZENG Shaoyi, ZHOU Bo, SONG Hongjiao, YUAN Jincai.
Key Technologies for TBM Equipment and Construction in Intact Hard Rock Spiral Tunnels
[J]. Tunnel Construction, 2026, 46(S1): 529-539.
|
| [6] |
TAO Zanxu, WANG Jian, WU Xianguo, LI Shifan, HUANG Fengjin, LI Wenjian.
Hybrid Optimization Framework for Large-Diameter Slurry Balance Shield Tunneling Safety and Stability
[J]. Tunnel Construction, 2026, 46(8): 1628-1639.
|
| [7] |
WANG Yi, ZHENG Wenbao, LUO Gang, LIU Jianping.
Multi-Objective Optimization of a Large-Diameter Shield Cutterhead System and Tunneling Parameters in Complex Strata
[J]. Tunnel Construction, 2026, 46(5): 1109-1120.
|
| [8] |
REN Guoping, ZHANG Jian, FENG Tugen, YU Xuejuan, ZHANG Wenchao, FANG Yuan.
A Dual-Path Prevention and Control Method for Mud Cakes on Shield Cutterhead in Highly Viscous Formations Based on Dispersant Treatment
[J]. Tunnel Construction, 2026, 46(3): 562-575.
|
| [9] |
HAO Sihaowensong, LI Shuchen, LI Xuewei, LIU Richeng, YIN Weifang, XU Kechun.
Experimental Simulation of Electrochemical Synergistic De-adhesion for Mitigating Shield Cutterhead Clogging in Clayey Strata
[J]. Tunnel Construction, 2026, 46(3): 586-598.
|
| [10] |
QI Wencong.
Regional Analysis of Disc Cutter Consumption and Failure of a TBM Conical Cutterhead in Spiral Ramp of Beishan Underground Laboratory
[J]. Tunnel Construction, 2026, 46(2): 322-335.
|
| [11] |
LI Wenqing, LIU Yongsheng, HONG Kairong, KOU Lei, TAN Zhongsheng, XU Weiqing, MA Shiju, ZHU Yongchao, YU Jingbo.
Mapping Relationships Between TBM Tunneling Parameters and Surrounding Rock Grades
[J]. Tunnel Construction, 2026, 46(2): 336-347.
|
| [12] |
GONG Qiuming, HUANG Liu, LIU Yongqiang, XIE Xingfei, HAO Gang, ZHANG Fang.
Development of a Rock Mass Information System for TBM Tunneling Faces
[J]. Tunnel Construction, 2026, 46(2): 348-358.
|
| [13] |
PAN Yue, XIE Tao, LIU Yongsheng, GAO Pan, YANG Zhenxing.
Intelligent Identification and Prevention of TBM Jamming in Hard-Rock Fractured Zones
[J]. Tunnel Construction, 2026, 46(2): 383-393.
|
| [14] |
HU Junwei.
Composite Rock Fragmentation Technology Using Blasting Presplitting and Disc Cutters for Highly Intact and Extremely Hard Rock
[J]. Tunnel Construction, 2026, 46(2): 394-405.
|
| [15] |
WU Fan, QI Mengxue, LEI Shengxiang, HUANG Jiangfan, SONG Hongjiao, ZHANG Yuntong, HU Junwei, LI Jucai.
Mucking for TBM Tunneling Using Continuous-Belt Conveyor Technology in Large-Slope Variable-Grade Spiral Tunnels
[J]. Tunnel Construction, 2026, 46(2): 419-429.
|