Abstract: In this study, to reduce or even prevent geological hazards, such as surrounding rock collapse, water inrush, and mud outburst during TBM tunneling, a comprehensive advanced geological prediction system based on TBMcarried rockbreaking seismic source and induced polarization is evaluated to accurately locate the adverse geology position ahead of the tunnel face. Thus, dynamic construction management methods are put forward to perform the advanced treatment of adverse geology and effectively prevent the occurrence of geological disasters. The engineering practice demonstrates that the proposed comprehensive advanced prediction system can effectively detect the adverse geology ahead of the tunnel face, and the dynamic construction management can successfully reduce or even prevent adverse geological disasters, ensuring a safe and highefficient TBM tunneling.
Key words: Gaoligongshan tunnel, TBM, comprehensive advanced forecast, adverse geology, construction management
CLC Number:
U 45
ZENG Yunchuan, LIU Jianbing, NIE Lichao. Application of Comprehensive Advanced Forecasting Technology Carried by TBM in Gaoligongshan Tunnel of DaliRuili Railway[J]. Tunnel Construction, 2021, 41(3): 419-426.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://www.suidaojs.com/EN/10.3973/j.issn.2096-4498.2021.03.010
http://www.suidaojs.com/EN/Y2021/V41/I3/419
Research on CrossSection of Traffic Tunnel Constructed by TBM for Pumped Storage Power Station
Effect of Angle between Mucking Slot and Adjacent Disc Cutter on Disc Cutter Wear Law
Analysis of Response Characteristics of Physical Parameters of Tunnel Seismic Prediction Method in TBMJammed Section of Gaoligongshan Tunnel
Construction Technology of Open TBM in Gaoligongshan Tunnel Crossing a HighPressure WaterRich WeakFracture Altered Structural Belt
Application of a DualSpeed Reducer for Main Drive of a TBM Remanufacturing Case of Gaoligongshan Tunnel
Key Technologies for TBM Jamming Release of Gaoligongshan Tunnel under Unfavorable Geologies
Analysis of SurroundingRock Disturbance Caused by TBM Excavation of Deepburied Railway Tunnel
Rockburst Characteristics and Prevention and Control Technologies for Tunnel Boring Machine Construction of Deepburied Tunnels
Study on Classification Index and Determination Method of Extrahard Rock for TBM Tunnel