Tunnel Construction ›› 2021, Vol. 41 ›› Issue (5): 721-728.DOI: 10.3973/j.issn.2096-4498.2021.05.004
Previous Articles Next Articles
FANG Junbo, LUO Binzhi, LIU Hongzhen
Online:
Published:
Abstract: Excessive consumption of concrete is a common problem in tunnel projects. Controlling excessive consumption of concrete is both the key and most difficult aspect of construction cost control. Accordingly, to effectively reduce construction costs, reasonably determine tunnel concrete consumption standards, and perform construction management and control, the consumption of concrete before and after construction is calculated and evaluated in terms of the cause of concrete consumption, consumption composition, consumption quantitative analysis, and the influence of the outline of the secondary lining formwork trolley. The following results are obtained. (1) The consumption of shotcrete in the primary support is mainly related to the design quantity, rebound quantity, and average linear overbreak quantity, and the theoretical consumption is approximately 1.6 to 3.8 times the design quantity. (2) The consumption of concrete for secondary lining formwork is mainly related to the design quantity and reserved deformation quantity, and when the actual reserved deformation quantity is onethird of the design reserved quantity, the theoretical consumption of concrete for secondary lining formwork is approximately 1.04 to 1.12 times the design quantity. (3) The structural strength and rigidity of the general secondary lining formwork trolley are relatively large, meeting the requirements of selfweight or impact pressure of secondary lining formwork from concrete pouring to initial setting, and the trolley contour does not need to be enlarged to prevent deformation and falling back.
Key words: railway tunnel, shotcrete, formwork concrete, average linear overbreak, rebound rate, reserved deformation, excessive consumption rate, consumption
CLC Number:
U 45
FANG Junbo, LUO Binzhi, LIU Hongzhen. Quantitative Analysis and Calculation of Concrete Consumption in Railway Tunnels[J]. Tunnel Construction, 2021, 41(5): 721-728.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://www.suidaojs.com/EN/10.3973/j.issn.2096-4498.2021.05.004
http://www.suidaojs.com/EN/Y2021/V41/I5/721
川藏铁路隧道TBM适应性选型分析及不良地质对策与思考
Study on Countermeasures for Major Unfavorable Geological Issues of Tunnels on SichuanTibet Railway
Research on Mechanical Characteristics of LargeSpan Tunnels in Bedding Mudstone with Sandstone Strata
Analysis and Discussion of Labor Cost in Budget Quota of Railway Tunnel Engineering
Analysis of Response Characteristics of Physical Parameters of Tunnel Seismic Prediction Method in TBMJammed Section of Gaoligongshan Tunnel
Construction Technology of Open TBM in Gaoligongshan Tunnel Crossing a HighPressure WaterRich WeakFracture Altered Structural Belt
Key Technologies for TBM Jamming Release of Gaoligongshan Tunnel under Unfavorable Geologies
Analysis of SurroundingRock Disturbance Caused by TBM Excavation of Deepburied Railway Tunnel
Experimental Study on Aerogeophysical Prospecting of Shergyla Mountain Tunnel on ChangduNyingchi Section of SichuanTibet Railway