| [1] |
SUN Honglin, LIU Tie, LIU Tiehua, HUA Xirui, CAI Sheng, ZHOU Wei.
Development Trend and Practice of Tunnel Advance Geological Prospecting Methods
[J]. Tunnel Construction, 2026, 46(S1): 9-28.
|
| [2] |
ZHOU Zehua, XU Youliang, JIN Baocheng, CHU Maocheng, ZHAO Xiaoyong, LU Xing’an.
Risk Identification of TBM Traversing Soft Rock Deformation Sections Based on Attention Convolutional Neural Network-Long Short-Term Memory Model
[J]. Tunnel Construction, 2026, 46(S1): 236-248.
|
| [3] |
WANG Shilong, GAO Baobin, WANG Xinzhuang, CAO Yongjing, ZHANG Changjuan, YANG Dongjie.
Cutterhead Jamming Mechanism and Prevention Strategy for an Open-Type TBM Crossing Collapse Columns
[J]. Tunnel Construction, 2026, 46(S1): 348-360.
|
| [4] |
QI Mengxue, XIA Yimin, LI Fengwei, ZHOU Yanling, ZENG Shaoyi, ZHOU Bo, SONG Hongjiao, YUAN Jincai.
Key Technologies for TBM Equipment and Construction in Intact Hard Rock Spiral Tunnels
[J]. Tunnel Construction, 2026, 46(S1): 529-539.
|
| [5] |
LI Qingmin, WANG Huawei, ZHAO Zhendong, LIU Sijin, YANG Chengxi, SHI Shuo.
Fault Diagnosis of TBM Electric Drive Systems Based on an Adaptive Sparse Fusion Network
[J]. Tunnel Construction, 2026, 46(9): 1825-1836.
|
| [6] |
LIU Binyuan, LUO Yanbin, TAN Chang, YANG Zhenxing, LYU Qianqian, CHEN Zhigang, LIU Weiwei.
Research and Application of a Real-Time Intelligent Early Warning Model for TBM Jamming Risk Based on Transformer Multi-Task Learning
[J]. Tunnel Construction, 2026, 46(8): 1729-1739.
|
| [7] |
WANG Jiannan, WANG Chunhua, REN Fuqiang, LI Qingsong, LIU Huaiqian, MA Qing, LIU Hao, SONG Xin, WANG Jie, LIN Yichao.
Seepage Pressure and Deformation of Surrounding Rock in Double-Shield TBM Tunnels in Water-Rich Fractured Ground: A Fluid-Solid Coupling Analysis
[J]. Tunnel Construction, 2026, 46(6): 1244-1253.
|
| [8] |
HAN Jialin, LIU Xue, WANG Xianjun, XIE Zheng.
Global Typical Case Statistics and Development Analysis of Full-Face Tunnel Boring Machines
[J]. Tunnel Construction, 2026, 46(6): 1359-1382.
|
| [9] |
XU Guangyi, QI Zhichong, ZHAO Zihui, JIA Tao, LI Ming, WU Hao, GENG Qi.
Design and Testing of a Cone-Shaped Cutterhead Based on Boring Method for Enlarged-Diameter Vertical Shafts
[J]. Tunnel Construction, 2026, 46(1): 194-203.
|
| [10] |
LI Shuaiyuan, LU Gaoming, ZHOU Jianjun, YANG Yandong, LIU Yuanguang.
New Progress in Design and Construction Technology of Multimode Tunnel Boring Machines in China
[J]. Tunnel Construction, 2025, 45(S2): 63-75.
|
| [11] |
CAI Caiwu.
Mechanical Effects of Vertical Shaft Construction in Intercity Railways Using Vertical Machinery Method
[J]. Tunnel Construction, 2025, 45(9): 1640-1648.
|
| [12] |
ZHOU Peng, SHANG Jianxu, ZHANG Tianyu, XU Jiacan, WANG Zinan, HE Enguang.
Rock-Breaking Mechanism and Specific
Energy of Disc Cutters in Tunnel Boring Machines Under
Different Surrounding Rock Pressures
[J]. Tunnel Construction, 2025, 45(5): 887-894.
|
| [13] |
ZHANG Ruilin.
Research on Connection Tunnel Boring Machine With Circumferential-Cutting Type Cutterhead
[J]. Tunnel Construction, 2025, 45(5): 1001-1008.
|
| [14] |
GOU Chengzhi, LIU Yongbin, ZHANG Xiaoping, LI Xinfang, LIU Bingsen.
Research and Application of Front-Mounted
Exploration Drilling and Grouting Reinforcement Technology in China′s
First Remanufactured Open
Tunnel Boring Machine
[J]. Tunnel Construction, 2025, 45(4): 834-843.
|
| [15] |
YU Qingzeng, NING Xiangke, ZHANG Xingbin, LI Lei.
Development and Application of a Full-Face
Inclined-Shaft Boring Machine With
a Gravity-Mucking System: A Case Study of Luoning
Inclined Shaft
[J]. Tunnel Construction, 2025, 45(4): 852-860.
|