[1] |
HUANG Mingli, JIANG Bo, WANG Chenglin, GUAN Qiang.
FullScale Model Tests on Water Pressure
Resistance of Karst Tunnel Lining Structure: a Case
Study of New Yuanliangshan Tunnel
[J]. Tunnel Construction, 2022, 42(S1): 48-55.
|
[2] |
ZHENG Ligang, CHANG Longfei, JIANG Hua, JIANG Yusheng.
Stress Characteristics of ConcreteFilled
Steel Tubular Column and Surface Deformation in PileBeamArch
Station with Different RiseSpan Ratios of Arch:
a Case Study of
Xiangheyuan Station on Beijing Metro Line 17
[J]. Tunnel Construction, 2022, 42(S1): 174-182.
|
[3] |
ZHANG Wenjun, NIU Rongjian, QI Jianbing, ZHANG Chi, ZHANG Gaole, HE Lichao, LYU Jirui.
Impact of Jack Thrust on Force and Deformation of
Segment Linings for ShallowBuried
Shield Tunnel with Super Large Diameter
[J]. Tunnel Construction, 2022, 42(S1): 66-78.
|
[4] |
WANG Wanping, HUANG Hong, XU Ping.
Impact of Lining Support Cancellation for #1 Inclined Shaft
of Qinling Tiantaishan Tunnel
[J]. Tunnel Construction, 2022, 42(S1): 79-84.
|
[5] |
WEI Gang, ZHANG Shuming, CUI Yunliang, DING Zhi.
Reinforcement Effect of Various Methods for Shield
Tunnels under Ground Surcharge
[J]. Tunnel Construction, 2022, 42(S1): 85-92.
|
[6] |
HUANG Yi, LIU Zhenghao, MA Xianfeng, ZHU Yaohong, DONG Zibo.
Research on Cutting Test and Numerical Simulation of Segments
Used in Connection Passage with Mechanical Excavation Method
[J]. Tunnel Construction, 2022, 42(S1): 93-103.
|
[7] |
LIU Shilei, TONG Yao, WANG Shugang.
Determination of Ventilation Volume for Special
Ventilation Shafts of Tunnel Construction and Its
Influencing Factors
[J]. Tunnel Construction, 2022, 42(S1): 104-111.
|
[8] |
LI Pengfei, LYU Zhipeng, ZHOU Ye, GUAN Xibin, HE Xu, TAO Qi.
Study on Thickness of Grouting Circle and Stress
Characteristics of Primary Support in Ice Water
Accumulation Tunnel
[J]. Tunnel Construction, 2022, 42(S1): 112-119.
|
[9] |
LI Pengfei, QIU Jinrun, WANG Limin, SHUAI Yubing, WANG Xijun, ZHANG Mingju, WANG Hao.
Mechanized Construction of Wastewater Pump Room in
Shield Tunnel
[J]. Tunnel Construction, 2022, 42(S1): 404-412.
|
[10] |
LI ke, LI Penghui, CAI Shuang, CHENG Liang, YAO Xuefeng.
Research on Tunnel Harmful Gas Control Technology
Based on Fuzzy Control
[J]. Tunnel Construction, 2022, 42(S1): 120-127.
|
[11] |
SHUAI Yubing, QIU Jinrun, LI Pengfei, WANG Limin, WANG Hao, WANG Xijun, ZHANG Mingju.
Experimental Study and Numerical Simulation of Bottom
Sealing of Shaft Pump Room in Shield Tunnel Constructed by
Mechanical Method
[J]. Tunnel Construction, 2022, 42(S1): 128-135.
|
[12] |
LI Peinan, ZHAI Yixin, FAN Jie, CHEN Peixin.
Lining Structural Stress Analysis and Load Setting
under Grouting Condition of SpecialShaped Shield
Tunneling
[J]. Tunnel Construction, 2022, 42(S1): 212-221.
|
[13] |
HE Zhankun.
Influence of Shield Tunnel of Hangzhou Metro Line 5 on
PileRaft Foundation of Existing Hangzhou South
Railway Station and Construction Control Technology
[J]. Tunnel Construction, 2022, 42(S1): 222-231.
|
[14] |
BAO Heli, JIANG Hong, PAN Weiqiang.
Research on Layout Technology of Semi-Universal Ring
Segments for Rectangular Shield Tunnel
[J]. Tunnel Construction, 2022, 42(S1): 232-237.
|
[15] |
TANG Jincai, CUI Youlong, TANG Junlin, WANG Gao.
Analysis of Large Deformation of Xiaoxiangling Tunnel
Based on Mechanical State Test of Surrounding Rock
[J]. Tunnel Construction, 2022, 42(S1): 238-248.
|