Tunnel Construction ›› 2021, Vol. 41 ›› Issue (7): 1079-1090.DOI: 10.3973/j.issn.2096-4498.2021.07.001

Previous Articles     Next Articles

Technical Difficulties and Countermeasure Suggestions in Tunnel Construction of Ya′an-Linzhi Section of Sichuan Tibet Railway

ZHAO Yong1, SHI Shaoshuai2, 3, TIAN Siming2, LI Guoliang4, TAO Weiming5, GUO Weidong3   

  1. (1. Sichuan Tibet Railway Co., Ltd., Chengdu 610045, Sichuan, China;2. China Railway Economic and Planning Research Institute, Beijing 100038, China;3. School of Qilu Transportation, Shandong University, Jinan 250002, Shandong, China;4. China Railway First Survey and Design Institute Group Co., Ltd., Xi′an 710043, Shaanxi, China;5. China Railway Eryuan Engineering Group Co., Ltd., Chengdu 610031, Sichuan, China)

  • Online:2021-07-20 Published:2021-07-29

Abstract: The total length of the new line from the Ya′an to Linzhi section of the SichuanTibet railway is 1 018 km, of which the total length of the tunnel is 841 km, accounting for 82.6%. The longest tunnel is Yigong tunnel with a length of 42.4 km. The SichuanTibet railway tunnel project faces worldclass challenges such as extremely complex geological conditions, extremely huge engineering scale, extremely severe environmental conditions, and extremely sensitive ecological environment. It is the most complex and difficult tunnel project in China and even around the world. In this paper, ten major engineering technical problems that will be faced in the YaanLinzhi section of the SichuanTibet railway are preliminarily analyzed, and based on the extreme construction environment, countermeasures and suggestions are put forward regarding geological prospecting, route selection, construction organization, technology and equipment innovation, disaster prevention and mitigation, emergency rescue and environmental protection, etc. The results can provide reference for the survey, design, construction, operation, and maintenance of the SichuanTibet railway, and a series of innovations will help in realizing a strong "tunnel country" of China.

Key words: SichuanTibet railway tunnel, extreme environment, survey and design, construction organization, disaster prevention and rescue, environmental protection, technical problems, countermeasures and suggestions