| [1] |
SUN Honglin, LIU Tie, LIU Tiehua, HUA Xirui, CAI Sheng, ZHOU Wei.
Development Trend and Practice of Tunnel Advance Geological Prospecting Methods
[J]. Tunnel Construction, 2026, 46(S1): 9-28.
|
| [2] |
GUO Yanhui, BI Wei.
Carbon Emission Analysis of Fully Electrified Integrated Equipment Systems in Highway Tunnel Construction: A Case Study of Qiaojia Tunnel in Yunnan, China
[J]. Tunnel Construction, 2026, 46(S1): 164-175.
|
| [3] |
HU Jianjun, GONG Min, ZHANG Rubo, WU Xiaodong, ZHANG Pinghua, ZHANG Tao, PENG Guoqing, WU Lijun.
Calculation Method for In-Hole Segmented Control Blasting Delay Parameters of Underground Cavern Deep-Hole Bench Based On Electronic Detonators
[J]. Tunnel Construction, 2026, 46(S1): 226-235.
|
| [4] |
WU Haosheng, LIU Jianguo, FU Yi, ZHANG Jianqiang, GUO Zhihui, ZHANG Ming, MULATI· Jueraiti, ZENG Lingjiang, DU Jiaxin, LIU Tuojiang.
Development and Field Testing of Tunnel/Roadway Blasting-Induced CO Photocatalytic Purification Device
[J]. Tunnel Construction, 2026, 46(S1): 361-374.
|
| [5] |
ZHOU Chuanchuan, XIA Wenjie, WANG Jihong, JIANG Shuang, WANG Shugang, WU Yuanjin, LUO Zhanfu, LIU Qijun.
Optimal Deployment of CO Monitoring Sensors for Blasting Operations in Drill-and-Blast Tunnels
[J]. Tunnel Construction, 2026, 46(S1): 519-528.
|
| [6] |
LIN Chungang, LI Jielin, ZHOU Zhibin, YANG Chengye, ZHANG Danfeng.
Development of Intelligent Construction System and Its Management Platform for Railway Tunneling With Drilling and Blasting Method
[J]. Tunnel Construction, 2026, 46(9): 1846-1860.
|
| [7] |
YUAN Zhenzhong, FANG Zhongqiang, YUE Ben, YU Zihan, WANG Wei, XU Zhisheng.
Smoke-Spread Distance of a Unilateral Centralized Exhaust With Symmetric Openings of Smoke-Exhaust Valves in Inclined Tunnels
[J]. Tunnel Construction, 2026, 46(9): 1874-1884.
|
| [8] |
LI Tengfei, LI Hongbing, ZHOU Zilong, YANG Zhilong, ZHANG Chengjiao, LENG Zhendong, TIAN Shuilong.
Borehole-Wall Pressure Calculation and Damage Mechanism of Tunnel Smooth Blasting Using Bulk Explosives With Eccentric Charging
[J]. Tunnel Construction, 2026, 46(9): 1934-1949.
|
| [9] |
SUN Zeyuan, ZHAO Cheng, XING Jinquan, JIA Ning, XU Haining.
Analytical Elastic Stress Solution for Lining-Surrounding Rock Structure of a Compressed Air Energy Storage Cavern Considering Drilling-and-Blasting Excavation Damage
[J]. Tunnel Construction, 2026, 46(7): 1483-1492.
|
| [10] |
FENG Shouzhong, KAN Deyuan, XIE Chengdong, YAN Zhiguo, SONG Yuan.
Coupling Analysis of Multiple Influencing Factors of Dynamic Visual Distance Based on Tunnel Luminous Environment
[J]. Tunnel Construction, 2026, 46(5): 935-945.
|
| [11] |
ZHAO Kai, XIA Bing, WANG Lichuan, WANG Haiyan, ZHANG Xuemin, ZHANG Junru.
Zonal Coupling Analysis on Dynamic Effect of Soil- Rock Composite Strata-Structure System Induced by Tunnel Blasting
[J]. Tunnel Construction, 2026, 46(5): 970-984.
|
| [12] |
XU Bangshu, ZHU Wanxin, SUN Weiliang, LIANG Long, ZHANG Wenxi, JIANG Peng.
Intelligent Recognition Method for Tunnel Blasting Half-Holes Based on Deep Learning
[J]. Tunnel Construction, 2026, 46(4): 694-703.
|
| [13] |
HU Qiang, LIU Wenxing, ZHANG Anrui, WU Mingfang, GUO Chun.
Low-Carbon Design Method for Highway Tunnel Lining Maintenance and Reinforcement Based on Life Cycle Assessment and Genetic Algorithm Optimization
[J]. Tunnel Construction, 2026, 46(4): 804-816.
|
| [14] |
XU Qingsong, SHI Aijun, CHEN Bin, MA Shuqi, ZHAO Yan.
Full Acoustic Waveform Signal Processing for Analysis of Blasting Damage of Surrounding Rock in Tunnels
[J]. Tunnel Construction, 2026, 46(2): 273-286.
|
| [15] |
HU Junwei.
Composite Rock Fragmentation Technology Using Blasting Presplitting and Disc Cutters for Highly Intact and Extremely Hard Rock
[J]. Tunnel Construction, 2026, 46(2): 394-405.
|