Tunnel Construction ›› 2021, Vol. 41 ›› Issue (S2): 626-633.DOI: 10.3973/j.issn.2096-4498.2021.S2.080

Previous Articles     Next Articles

Adaptive Design of Tunnel Boring Machine Used in SichuanTibet Railway Tunnel under Complex and Severe Conditions

LONG Bin, LIU Zhihua, XIAO Jing   

  1. (China Railway Construction Heavy Industry Co., Ltd., Changsha 410100, Hunan, China)
  • Online:2021-12-31 Published:2022-03-18

Abstract: The SichuanTibet railway tunnels bored by tunnel boring machines (TBMs) are long and deep, some complex and severe geological conditions may be encountered, such as hard rock burst, soft rock large deformation, fault fracture zone, karst, harmful gas, high temperature damage, as well as the construction problems including high altitude hypoxia, and longdistance reverse slope with water inrush. To ensure the safe and efficient construction of TBM, it is essential to carry out TBM adaptive design for SichuanTibet railway tunnels under complex and severe conditions. The difficulties and construction risks of TBM tunnels of SichuanTibet railway are summarized, and based on the previous typical engineering experience, the adaptive design scheme is put forward from the aspects of TBM equipment configuration, structural optimization, and construction measures, which can provide reference for equipment configuration and construction process optimization, and improve the capacity of construction risk response. Meanwhile, based on intelligent and information technology, the intelligent early warning system of complex geological risk, construction collaborative management platform, and online monitoring and diagnosis system of equipment status are integrated on TBM, realizing TBM intelligent auxiliary construction and risk prevention and control.

Key words: railway tunnel, SichuanTibet railway, tunnel boring machine, construction risk, adaptive design