| [1] |
SUN Honglin, LIU Tie, LIU Tiehua, HUA Xirui, CAI Sheng, ZHOU Wei.
Development Trend and Practice of Tunnel Advance Geological Prospecting Methods
[J]. Tunnel Construction, 2026, 46(S1): 9-28.
|
| [2] |
ZHOU Zehua, XU Youliang, JIN Baocheng, CHU Maocheng, ZHAO Xiaoyong, LU Xing’an.
Risk Identification of TBM Traversing Soft Rock Deformation Sections Based on Attention Convolutional Neural Network-Long Short-Term Memory Model
[J]. Tunnel Construction, 2026, 46(S1): 236-248.
|
| [3] |
WANG Shilong, GAO Baobin, WANG Xinzhuang, CAO Yongjing, ZHANG Changjuan, YANG Dongjie.
Cutterhead Jamming Mechanism and Prevention Strategy for an Open-Type TBM Crossing Collapse Columns
[J]. Tunnel Construction, 2026, 46(S1): 348-360.
|
| [4] |
YU Li, GUO Xiaohan, WANG Mingnian, LIU Yuan, LI Junqi.
Design of Evacuation and Rescue in Underwater Railway Shield Tunnels Based on Evacuation Psychology and operational safety
[J]. Tunnel Construction, 2026, 46(S1): 397-405.
|
| [5] |
QI Mengxue, XIA Yimin, LI Fengwei, ZHOU Yanling, ZENG Shaoyi, ZHOU Bo, SONG Hongjiao, YUAN Jincai.
Key Technologies for TBM Equipment and Construction in Intact Hard Rock Spiral Tunnels
[J]. Tunnel Construction, 2026, 46(S1): 529-539.
|
| [6] |
LI Qingmin, WANG Huawei, ZHAO Zhendong, LIU Sijin, YANG Chengxi, SHI Shuo.
Fault Diagnosis of TBM Electric Drive Systems Based on an Adaptive Sparse Fusion Network
[J]. Tunnel Construction, 2026, 46(9): 1825-1836.
|
| [7] |
LIN Chungang, LI Jielin, ZHOU Zhibin, YANG Chengye, ZHANG Danfeng.
Development of Intelligent Construction System and Its Management Platform for Railway Tunneling With Drilling and Blasting Method
[J]. Tunnel Construction, 2026, 46(9): 1846-1860.
|
| [8] |
LI Xu, DUO Shengjun, REN Chenning, WANG Huiwu, HUANG Pengli, ZHOU Mingliang.
Line Fitting for Emergency Repair of Tunnels Crossing Active Faults After Seismic Displacement Based on Objective Optimization Using Nondominated Sorting Genetic Algorithm Ⅱ
[J]. Tunnel Construction, 2026, 46(9): 2001-2010.
|
| [9] |
LIU Binyuan, LUO Yanbin, TAN Chang, YANG Zhenxing, LYU Qianqian, CHEN Zhigang, LIU Weiwei.
Research and Application of a Real-Time Intelligent Early Warning Model for TBM Jamming Risk Based on Transformer Multi-Task Learning
[J]. Tunnel Construction, 2026, 46(8): 1729-1739.
|
| [10] |
LIAN Jie, YANG Jixiang, TIAN Siming, XING Peigang, CHEN Xiwu, GUO Quan, SHI Zhengying.
Automated Recognition and Management System for Railway Tunnel-Construction Processes
[J]. Tunnel Construction, 2026, 46(6): 1208-1219.
|
| [11] |
WANG Jiannan, WANG Chunhua, REN Fuqiang, LI Qingsong, LIU Huaiqian, MA Qing, LIU Hao, SONG Xin, WANG Jie, LIN Yichao.
Seepage Pressure and Deformation of Surrounding Rock in Double-Shield TBM Tunnels in Water-Rich Fractured Ground: A Fluid-Solid Coupling Analysis
[J]. Tunnel Construction, 2026, 46(6): 1244-1253.
|
| [12] |
HAN Jialin, LIU Xue, WANG Xianjun, XIE Zheng.
Global Typical Case Statistics and Development Analysis of Full-Face Tunnel Boring Machines
[J]. Tunnel Construction, 2026, 46(6): 1359-1382.
|
| [13] |
ZHANG Tian, FU Bingxian, GAO Yaming, NIU Yabin, ZHANG Lixia.
Prefabricated Composite Lining Structure for Reinforcing Railway Tunnel Linings and Its Construction Technology
[J]. Tunnel Construction, 2026, 46(5): 1121-1132.
|
| [14] |
TIAN Siming, ZHANG Yiteng, LI Shucai, LIU Dagang, LI Xu.
Construction and Intelligent Design of a High-Performance Active Support System for Railway Tunnels
[J]. Tunnel Construction, 2026, 46(4): 790-803.
|
| [15] |
ZHAO Xiaoyong, LI Guoliang, WANG Xindong, GAO Xinqiang, XIONG Wei, GUO Xiansuo.
Mechanical Properties of Prefabricated Inverted Arch Structures in Railway Tunnels During Construction
[J]. Tunnel Construction, 2026, 46(4): 828-839.
|