| [1] |
FU Baiyong, SONG Shenyou, JIN Wenliang.
Vibrodensification Test and Particle Flow Simulation of Rock Cushion in Immersed Tunnels
[J]. Tunnel Construction, 2025, 45(6): 1090-1101.
|
| [2] |
HUANG Weizhen, HE Cong, XU Guoyuan, LI Baijian.
Seismic Response of a Submarine Immersed Tunnel Under
Oblique Incidence of SV Waves
[J]. Tunnel Construction, 2024, 44(4): 724-738.
|
| [3] |
WU Mengjun, WU Qingliang, SONG Shenyou, CAO Peng.
Fire Resistance Limit Standard and Fire Protection
Technology of Steel Shell Immersed Tunnel: A Case Study of ShenzhenZhongshan Link Immersed Tunnel
[J]. Tunnel Construction, 2024, 44(2): 257-265.
|
| [4] |
XIA Fengyong, SUN Shipeng, YAO Dian, CHI Minghua, DENG Bin.
Precision Control Technology for Gravel Foundation
Leveling in Immersed Tunnel of ShenzhenZhongshan Link
[J]. Tunnel Construction, 2024, 44(1): 181-188.
|
| [5] |
XU Yu, XU Guoping, CHEN Weile, SONG Shenyou.
Optimal Layout of Deep Cement Mixing Piles for
Composite Foundations in Immersed Tunnels: A Case Study of
ShenzhenZhongshan Link
[J]. Tunnel Construction, 2023, 43(11): 1944-1953.
|
| [6] |
DENG Bin, HUANG Qingfei, JIN Wenliang, LIU Minghu, XIA Fengyong, JI Hai.
Study on Construction of Underwater PushType
Final Joint of Immersed Tunnel in ShenzhenZhongshan Link
[J]. Tunnel Construction, 2023, 43(10): 1769-1778.
|
| [7] |
GUO Jianmin, SHAN Lianjun, MA Mingjun.
Statistical Analysis and Development of Immersed Tube
Tunnels in China
[J]. Tunnel Construction, 2023, 43(1): 173-184.
|
| [8] |
SU Zongxian, WU Xudong, WU Qilin, CHEN Yue, ZHANG Changliang, YANG Cixiang.
Stress Checking Calculation and Accuracy Control
Requirement of Steel Shell Secondary Sitting onto Dock
Piers for ShenzhenZhongshan Link
Immersed Tunnel Tube
[J]. Tunnel Construction, 2022, 42(S2): 273-279.
|
| [9] |
JIN Wenliang XU Guoping, GUO Yawei, ZHU Yaoyu, SONG Shenyou, WANG Qiang, HUANG Qingfei.
Experimental Research and Design Principle Analysis on
Push Type Final
Joint of Immersed Tunnel in ShenzhenZhongshan Link
[J]. Tunnel Construction, 2022, 42(S2): 305-311.
|
| [10] |
WANG Xiaodong, LI Hongbin.
Comparative Study on Prefabrication & WaterEntry
Technology of Reinforced Concrete Element of Immersed
Tunnel
[J]. Tunnel Construction, 2022, 42(S1): 449-458.
|
| [11] |
HONG Kairong, DU Yanliang, CHEN Kui, FENG Huanhuan, JIA Lianhui, XU Fei.
Full-Face Tunnel Boring Machines
(Shields/TBMs) in China: History, Achievements, and
Prospects
[J]. Tunnel Construction, 2022, 42(5): 739-756.
|
| [12] |
ZHANG Changliang, LI Songhui, ZHANG Yan, PENG Yingjun, LIU Xunnan, BAI Bing.
Application of Impact Imaging Method in Void Detection
of a Steel Shell Concrete
Interface in ShenzhenZhongshan Link Immersed Tunnel
[J]. Tunnel Construction, 2022, 42(12): 2138-2147.
|
| [13] |
NING Jinjin, SONG Shenyou, YANG Fulin, XIA Yuanzhi, GAO Heng.
Computational Analysis of Mooring System for
Transportation-Immersion Rig
in Secondary Outfitting Area of Shenzhen-Zhongshan Link
[J]. Tunnel Construction, 2021, 41(S2): 151-157.
|
| [14] |
LIU Jian, DENG Bin, HUANG Qingfei.
Design and Manufacturing Techniques for Steel-Shell
Structure of Shenzhen-Zhongshan
Link′s Immersed Tunnel
[J]. Tunnel Construction, 2021, 41(8): 1367-.
|
| [15] |
LI Jianbin.
Current Status, Problems and Prospects of Research,
Design, and Manufacturing of Boring Machine in China
[J]. Tunnel Construction, 2021, 41(6): 877-896.
|