Tunnel Construction ›› 2022, Vol. 42 ›› Issue (5): 833-840.DOI: 10.3973/j.issn.2096-4498.2022.05.009
Previous Articles
Next Articles
Stability Analysis of Excavation Surface Induced by
Shield Chamber Opening under Pressure and Rational Position
of Cutter Replace
HU Weidong1, 2,
ZHOU Ziyang3, FENG Kun3, *, DENG Zhaohui1,
2, LIU Yiwen3
- (1. China Railway Siyuan Survey and Design Group Co.,
Ltd., Wuhan 430063, Hubei, China; 2. Hubei Provincial Engineering
Laboratory for Underwater Tunnel, Wuhan 430063, Hubei, China; 3. Key Laboratory of Transportation Tunnel
Engineering, Ministry of Education, Southwest Jiaotong University, Chengdu
610031, Sichuan, China)
-
Online:
2022-05-20
Published:
2022-06-02
-
-
-