Tunnel Construction ›› 2022, Vol. 42 ›› Issue (S2): 267-272.DOI: 10.3973/j.issn.2096-4498.2022.S2.033

Previous Articles     Next Articles

Design and Engineering Practice of a New Mining Method Using Underground Bundle Composite Pipe Integrated by Transverse PreStressing in Waterrich Soft Soil Area

ZHANG Zhongjie1, LIU Shu1*, LYU Peilin1, LIU Xian2   

  1. (1. Shanghai Urban Construction Design and Research Institute (Group) Co., Ltd., Shanghai 200025, China; 2. Tongji University, Shanghai 200092, China)

  • Online:2022-12-30 Published:2023-03-24

Abstract: In this paper, the No. 1 entrance and exit project of Wuding road station of Shanghai rail transit is taken as an example to solve the construction problems of the fullface mining method without temporary support and soil reinforcement, and with integration of advance support and permanent structure in waterrich soft soil areas. A new mining method with bundled pipe curtains is proposed, which can also be referred to as the UBIT (underground bundle composite pipe integrated by transverse prestressing) method, that is, by transversely tensioning the prestressed tendons, the discrete and smallsection square steel pipes pushed in longitudinally are bundled into an integral structure. Combined with the structural characteristics of this method, the joint model using rigid platespring element coupling, the CT type lock, the standard pipe, and the corner tool pipe that can meet the negative bending moment of the joint, the layout method of transverse prestressed tendon are introduced. And through the research of shearing, bending joint test, and 1/4 structure fullscale test, it is revealed that the performance of the bundled pipe curtain lies in the bearing performance of the joint and the effect of the prestressed tendon. Engineering practice and onsite monitoring data show that the application is in good condition, which further verifies the safety and applicability of the design scheme.

Key words: waterrich soft soil area, underground bundle composite pipe integrated by transverse prestressing method, bundled pipe curtain, prestress, underground excavation