| [1] |
FU Baiyong, SONG Shenyou, JIN Wenliang.
Vibrodensification Test and Particle Flow Simulation of Rock Cushion in Immersed Tunnels
[J]. Tunnel Construction, 2025, 45(6): 1090-1101.
|
| [2] |
ZHAO Hongbo, LIU Guoqing, ZHANG Changliang, ZHONG Huihong, SONG Shenyou, FAN Ziwu, PENG Yingjun, JIN Wenliang.
Application of Neutron Scattering Method for Identifying Voids at Steel Shell-Concrete Interfaces
[J]. Tunnel Construction, 2025, 45(12): 2266-2274.
|
| [3] |
HUANG Weizhen, HE Cong, XU Guoyuan, LI Baijian.
Seismic Response of a Submarine Immersed Tunnel Under
Oblique Incidence of SV Waves
[J]. Tunnel Construction, 2024, 44(4): 724-738.
|
| [4] |
WU Mengjun, WU Qingliang, SONG Shenyou, CAO Peng.
Fire Resistance Limit Standard and Fire Protection
Technology of Steel Shell Immersed Tunnel: A Case Study of ShenzhenZhongshan Link Immersed Tunnel
[J]. Tunnel Construction, 2024, 44(2): 257-265.
|
| [5] |
XIA Fengyong, SUN Shipeng, YAO Dian, CHI Minghua, DENG Bin.
Precision Control Technology for Gravel Foundation
Leveling in Immersed Tunnel of ShenzhenZhongshan Link
[J]. Tunnel Construction, 2024, 44(1): 181-188.
|
| [6] |
MA Desen, WANG Wei, ZHU Ling, XUE Mengqi, XU Qingshuang, DONG Hui.
Research and Application of Installation Technology of
Inflatable Water Stop for Final Joints of ShenzhenZhongshan
Link
[J]. Tunnel Construction, 2023, 43(S2): 544-549.
|
| [7] |
FENG Xiandao, WANG Cong, SUN Xiaowei, ZENG Bocun.
Design and Application of Secondary Cofferdam
Structure at Onshore Final Joint
of Immersed Tunnel: a Case Study of Yuliangzhou Section
[J]. Tunnel Construction, 2023, 43(4): 665-673.
|
| [8] |
XU Yu, XU Guoping, CHEN Weile, SONG Shenyou.
Optimal Layout of Deep Cement Mixing Piles for
Composite Foundations in Immersed Tunnels: A Case Study of
ShenzhenZhongshan Link
[J]. Tunnel Construction, 2023, 43(11): 1944-1953.
|
| [9] |
DENG Bin, HUANG Qingfei, JIN Wenliang, LIU Minghu, XIA Fengyong, JI Hai.
Study on Construction of Underwater PushType
Final Joint of Immersed Tunnel in ShenzhenZhongshan Link
[J]. Tunnel Construction, 2023, 43(10): 1769-1778.
|
| [10] |
JIN Wenliang XU Guoping, GUO Yawei, ZHU Yaoyu, SONG Shenyou, WANG Qiang, HUANG Qingfei.
Experimental Research and Design Principle Analysis on
Push Type Final
Joint of Immersed Tunnel in ShenzhenZhongshan Link
[J]. Tunnel Construction, 2022, 42(S2): 305-311.
|
| [11] |
WANG Xiaodong, LI Hongbin.
Comparative Study on Prefabrication & WaterEntry
Technology of Reinforced Concrete Element of Immersed
Tunnel
[J]. Tunnel Construction, 2022, 42(S1): 449-458.
|
| [12] |
HAN Zhanwei, LIU Di, CHENG Yipin.
Application of Leveling and Positioning System for
Gravel Bed
of Excavator Used in ShenzhenZhongshan Link
[J]. Tunnel Construction, 2022, 42(S1): 480-485.
|
| [13] |
WU Xudong, XI Junjie, LIU Hui, SU Zongxian, LIANG Jianwen, LIU Shaowei.
Intelligent Casting Technology of Self-Compacting
Concrete for Steel-Shells of Shenzhen-Zhongshan Link Immersed Tunnel Tubes
[J]. Tunnel Construction, 2022, 42(2): 328-335.
|
| [14] |
ZHANG Changliang, LI Songhui, ZHANG Yan, PENG Yingjun, LIU Xunnan, BAI Bing.
Application of Impact Imaging Method in Void Detection
of a Steel Shell Concrete
Interface in ShenzhenZhongshan Link Immersed Tunnel
[J]. Tunnel Construction, 2022, 42(12): 2138-2147.
|
| [15] |
GUO Jianmin, SHAN Lianjun.
Structure Type and Prefabrication Scheme of Immersed
Tunnels in Urban Core Areas: a Case Study of Pazhou
West Tunnel Project in Guangzhou, China
[J]. Tunnel Construction, 2022, 42(11): 1906-1912.
|