| [1] |
WANG Shuangwang, YANG Bin, ZHONG Qingfeng, CHEN Liangwu.
Intelligent Fault Diagnosis of Low-Speed, Heavy-Load, Ultra-Large Rolling Bearings Using a Channel Attention Mechanism and a One-Dimensional Convolutional Neural Network
[J]. Tunnel Construction, 2026, 46(5): 985-993.
|
| [2] |
LIU Hongzhi, HAO Shuning, GUO Yidong, LI Xinggao.
Rock Chip Geometric Feature Recognition in Shield Tunneling Based on Instance Segmentation
[J]. Tunnel Construction, 2026, 46(3): 478-490.
|
| [3] |
CHEN Zhuo, ZHANG Xiaoping, XIE Xuan, LIU Yongbin, WANG Kun, SU Peng.
Intelligent Recognition Method for Rock Discontinuities Based on Neural Network and Density Peak Clustering
[J]. Tunnel Construction, 2026, 46(2): 359-370.
|
| [4] |
JIANG Hongyue, WANG Fan, WANG Zhihua, ZHAI Shiji.
Online Prediction of Shield Attitude for Long-Distance Tunneling
[J]. Tunnel Construction, 2025, 45(S2): 236-248.
|
| [5] |
ZHOU Shuliang, WEI Xiaolong, XIE Hongwu, FENG Shuo, LIN Fulong, HUANG Zhen, JIAO Jingbo.
Muck Volume Measurement System Based on Irregular
Triangular Prism Model
[J]. Tunnel Construction, 2025, 45(S1): 88-95.
|
| [6] |
LI Jianxin, ZHANG Jixun, MA Jia, REN Xuhua, ZHANG Yuxian, DENG Zi′ang.
Optimizing Initial Geostress Field Inversion Using Least Absolute Shrinkage and Selection Operator-Ordinary Least Squares Method
[J]. Tunnel Construction, 2025, 45(9): 1698-1710.
|
| [7] |
FU Baiyong, SONG Shenyou, JIN Wenliang.
Vibrodensification Test and Particle Flow Simulation of Rock Cushion in Immersed Tunnels
[J]. Tunnel Construction, 2025, 45(6): 1090-1101.
|
| [8] |
HE Junyuan, LIANG Di, YANG Guihua, HE Shiyong, LAI Zhongyu, ZHANG Chaoyu, WANG Wei, ZENG Meiting, WANG Sheng.
Prediction of Water Inrush
Risk Level Based on a Convolutional Neural Network-Long Short-Term Memory Network Hybrid Model for Karst Tunnels: A Case Study of Wufu Tunnel
[J]. Tunnel Construction, 2025, 45(6): 1131-1141.
|
| [9] |
YANG Junsheng, LUO Yubo, FU Jinyang, CHEN Jianwei, WAN Zheng, ZHU Zhiheng.
Over- and Under-Excavation
Detection Method and Application of Variable-Section Tunnels Based on Three-Dimensional Image
Reconstruction Technology
[J]. Tunnel Construction, 2025, 45(4): 687-694.
|
| [10] |
YU Qingzeng, NING Xiangke, ZHANG Xingbin, LI Lei.
Development and Application of a Full-Face
Inclined-Shaft Boring Machine With
a Gravity-Mucking System: A Case Study of Luoning
Inclined Shaft
[J]. Tunnel Construction, 2025, 45(4): 852-860.
|
| [11] |
GONG Jiangfeng, WANG Wei, LI Xu, HE Wei, YUAN Yi, WANG Fang, YANG Changxian, DING Xiang, HAN He, LI Li, CAO Yong.
Statistics of China′s Railway Tunnels by the End of 2024 and
Overview of Tunnels of New Projects in 2024
[J]. Tunnel Construction, 2025, 45(3): 636-653.
|
| [12] |
SONG Yaodong, ZHENG Xiaobing, ZHU Ying, LI Jianjun, CAO Chenxu.
Extraction Method of Steel-Arch Locations in TBM Tunnels Based on Laser Point-Cloud Feature Template Matching
[J]. Tunnel Construction, 2025, 45(11): 2091-2099.
|
| [13] |
JIANG Wei, SONG Renjie, WU Yimin, FU Helin, HUANG Le.
Utilizing Integrated Spatiotemporal Attention Mechanism for One-Dimensional Convolutional Neural Network-Based Prediction of Surrounding Rock Ahead of Tunnel Face
[J]. Tunnel Construction, 2025, 45(10): 1906-1918.
|
| [14] |
LIAO Yunyang, ZHANG Heng, LIAO Rupeng, LEI Mingcheng, DING Bosong, WANG You.
Influence of Metal Ion
Complex on ζ Potential
in Shield Muck During Solidification
[J]. Tunnel Construction, 2024, 44(S2): 144-151.
|
| [15] |
XIAO Qinghua, YUAN Hao, XIA Jinxuan, OU Xiaoqiang, ZANG Xiwei, ZHONG Dechao, LIU Zhiqiang.
Tunnel Blasting Parameters
Optimization Design Method Based on Three-Dimensional Laser Sensing
[J]. Tunnel Construction, 2024, 44(S1): 8-15.
|