[1] |
YANG Yandong.
Stability Identification Methods for Tunnel
Surrounding Rock Based on Tunneling Parameters
[J]. Tunnel Construction, 2023, 43(3): 423-428.
|
[2] |
LIU Jiao, JIA Lianhui, FAN Lei, DONG Yanping, YUAN Zheng.
Key Technologies of Excavation Blind Area Treatment
for NonCircular Tunnel
Boring Machine in Composite Strata
[J]. Tunnel Construction, 2023, 43(2): 345-353.
|
[3] |
YAO Zhibin, XIONG Yongrun, FU Lianjie, QUAN Yongwei, NIU Wenjing, HU Lei.
Failure Mechanism and Support Technology of
Surrounding Rocks in Lithologic Interface
Area of DeepBuried Tunnel Bored by Tunnel Boring Machine
[J]. Tunnel Construction, 2023, 43(1): 102-111.
|
[4] |
TANG Jianguo, PENG Zhengyang, ZHANG Xiangfu, REN Xin, YUE Jinwen, ZHOU Fangjian.
Effect of Tunneling Parameters on Mucking Performance
of Tunnel Boring Machine Cutterhead in PumpedStorage Power Station Inclined Shaft
[J]. Tunnel Construction, 2022, 42(S2): 29-35.
|
[5] |
ZHENG Yongguang, CHEN Jingju, FAN Yalei, WANG Heng, SUN Yanming.
A Segmentation Algorithm of Rock Ballast Image Based
on Improved
Concave Point Matching
[J]. Tunnel Construction, 2022, 42(S2): 181-188.
|
[6] |
CHEN Qiao, LI Zhijun, NIU Tongtong, ZHANG Hepei, ZHOU Yi, YU Jingbo.
Optimization of Tunnel Lining CrossSection
by Tunnel Boring Mahine Method in
Plateau Railway with Complex Geology
[J]. Tunnel Construction, 2022, 42(S2): 334-344.
|
[7] |
QI Mengxue, XUE Yongqing, ZENG Shaoyi, YANG Guoqing, ZHOU Yanling.
Key Construction Technologies of Tunnel Boring Machine in
Complex Geology of Z Tunnel in Plateau Railway
[J]. Tunnel Construction, 2022, 42(S2): 352-362.
|
[8] |
JIA Ke, SONG Tiantian, SUN Qianwei, WANG Pinghao, LOU Yonglu, YANG Junwu.
Analysis of Tunneling Performance of Earth Pressure
Balance/Tunnel Boring
Machine DoubleMode Shield in Complex Strat#br#
[J]. Tunnel Construction, 2022, 42(S2): 479-486.
|
[9] |
LIAO Xiaochun.
Cost Determinate Method of Tunnel Boring Machine-Type Selection for Hard Rock Tunnels
[J]. Tunnel Construction, 2022, 42(S2): 508-515.
|
[10] |
XING Hai, WANG Shuangjing, YIN Tao.
Prediction Model for Tunnel Boring Machine Cutterhead
Rotation Speed Based on
Field Penetration Index and Torque Penetration Index
[J]. Tunnel Construction, 2022, 42(S2): 516-524.
|
[11] |
GUO Zhi, WANG Xiwei, GONG Yinglei, LI Ping, SUN Fubin, LEI Chenglong.
InTunnel Disassembling Technique of
DoubleShield Tunnel Boring Machine
in Shallow Tunnel
[J]. Tunnel Construction, 2022, 42(S1): 420-426.
|
[12] |
LIU Hua.
Experimental Research on Key Parameters of Main Drive
HighPressure Sealing System of Tunnel Boring
Machines
[J]. Tunnel Construction, 2022, 42(9): 1622-1627.
|
[13] |
DU Chuangdong, HONG Kairong, LI Zhijun, YANG Yandong.
Key Technologies of Tunnel Boring Machine Passing
through Unfavorable Geology: a
Case Study of Entrance Section of a Plateau Railway Tunnel
[J]. Tunnel Construction, 2022, 42(7): 1274-1288.
|
[14] |
HONG Kairong, DU Yanliang, CHEN Kui, FENG Huanhuan, JIA Lianhui, XU Fei.
Full-Face Tunnel Boring Machines
(Shields/TBMs) in China: History, Achievements, and
Prospects
[J]. Tunnel Construction, 2022, 42(5): 739-756.
|
[15] |
ZHANG Henghui, WU Wei.
Application of Adjustment Coefficient of Cerchar
Abrasiveness Index for Rock
Abrasiveness of Tunnel Boring Machine Cutter
[J]. Tunnel Construction, 2022, 42(2): 231-236.
|