Longitudinal Uplift Analysis of Existing Shield Tunnel Induced by New Overcrossing Tunnel

GAO Kun1, 2, SU Xiaofeng3, ZHANG Zhiwei3, LIANG Rongzhu1, 2, 3, 4, *, LI Zhongchao4, GUO Yang1, 2, 3, YUE Tengsheng1, 2   

  1. (1.Anhui Province Institute of Building Research & Design,Hefei 230031,Anhui,China;2.Anhui Key Laboratory of Green Building and Assembly Construction, Hefei 230031, Anhui, China;3.Faculty of Engineering,China University of Geosciences,Wuhan 430074,Hubei,China;4.Wuhan Municipal Construction Group Co.,Ltd.,Wuhan 430023,Hubei,China)
  • Online:2023-05-20 Published:2023-06-20

Abstract: To accurately predict the longitudinal deformation of an existing shield tunnel caused by newlybuilt overcrossing tunnel, the Kerr foundation model is introduced that can more reasonably simulate the tunnelsoil interaction and the existing tunnel is simplified as the EulerBernoulli beam on the Kerr foundation. Then, based on the Mindlin solution, the additional stress generated on the axis of the existing tunnel by the newlybuilt tunnel excavation is determined. Furthermore, based on the finite difference method, the solution of longitudinal deformation of the existing shield tunnel induced by the overcrossing of the newlybuilt tunnel is obtained. Finally, three engineering cases are used to verify the effectiveness of the proposed method, and some parameters are analyzed and discussed. The results show that the proposed method can predict the longitudinal deformation of the existing shield tunnel induced by the new tunnel overcrossing more accurately than predicted by the Winkler and Pasternak foundation models. The results of the analytical parameters reveal that with the increase in the newlybuilt tunnels diameter, the uplift value and influence range of the existing tunnel increase simultaneously, while the increase in the clearance slightly reduces the uplift value of the existing tunnel, but does not affect the influence range of the existing tunnel. Thus, deformation monitoring and safety measures should be adopted for the existing tunnels when a newlybuilt tunnel is crossing above with a large crosssection or small clearance.

Key words: newlybuilt tunnel, existing shield tunnel, longitudinal deformation, EulerBernoulli beam; Kerr foundation model