[1] |
XIAO Mingqing, SUN Wenhao, QU Liqing, LI Xiang, CHEN Libao, NI Jian, MA Xiangfeng.
Study on General Design of Second Jiaozhou Bay Subsea
Tunnel
[J]. Tunnel Construction, 2023, 43(2): 199-216.
|
[2] |
WU Zheshu, CAO Jun, SUN Wenhao, CUI Zhen, ZHANG Jin.
PhysicoMechanical Properties of LargeSize Super Absorbent Polymer
Concrete Buffer Materials
[J]. Tunnel Construction, 2023, 43(12): 2056-2065.
|
[3] |
FEI Jianbo, WEI Jiayan, JIN Jiakang, MA Weibin, CHEN Xiangsheng.
Design and Application of Seismic Isolation Structure
for Mountain Tunnels in EarthquakeProne
Areas
[J]. Tunnel Construction, 2023, 43(11): 1935-1943.
|
[4] |
TIAN Siming, WU Kefei, YU Li, LI Xu, GONG Jiangfeng, WANG Xindong.
Key Technology of AntiSeismic for Railway Tunnels Crossing Active
Fault Zone
[J]. Tunnel Construction, 2022, 42(8): 1351-1364.
|
[5] |
WANG Guo′an, WANG Chaofeng, CHEN Qiao, ZHANG Wenxin.
SuperLarge Diameter Shield Tunneling
Method in Extremely Soft and Hard Composite
Strata: a Case Study of Shantou Bay Tunnel
[J]. Tunnel Construction, 2022, 42(5): 892-899.
|
[6] |
DAI Xin, HE Weiguo, WANG Dongwei, LYU Qingsong, YU Yong.
Drainage Design of a DeepBuried
Subsea Tunnel Using Mining Method: a Case Study of Pearl River Estuary Railway Tunnel
[J]. Tunnel Construction, 2022, 42(4): 695-702.
|
[7] |
YANG Xiuren.
Design Technology and Method of OpenCut Prefabricated
Underground Structures of Urban Rail Transit
[J]. Tunnel Construction, 2022, 42(3): 355-362.
|
[8] |
WANG Mingnian, YANG Henghong, ZHANG Yiteng, LIU Kerui, YU Li.
Corrosion Expansion Force of Steel Arch Corrosion and Shotcrete
under Chloride Penetration
[J]. Tunnel Construction, 2022, 42(2): 224-230.
|
[9] |
WANG Mingnian, LIU Kerui, ZHANG Yiteng, YANG Henghong, YU Li.
Research on Flexural Capacity of Steel Reinforced
Concrete Beams Subjected to Steel Arch Corrosion
[J]. Tunnel Construction, 2022, 42(1): 26-32.
|
[10] |
ZHANG Yiteng, WANG Mingnian, YU Li, YANG Henghong, LIU Kerui.
Influence of Steel Arch Frame Corrosion on Mechanical
Behaviors of Tunnel Support System
[J]. Tunnel Construction, 2021, 41(S2): 313-319.
|
[11] |
ZHANG Yanwei, SHI Quanqiang, ZHENG Qingjun.
Research on Antigush Technology for
Asymmetrically Pressured Section with Weathered Sac in DrillingandBlasting Subsea Tunnel
under
High Water Pressure
[J]. Tunnel Construction, 2021, 41(S1): 367-.
|
[12] |
TIAN Siming, WANG Wei, TANG Guorong, LI Xu.
Study on Countermeasures for Major Unfavorable
Geological Issues
of Tunnels on SichuanTibet Railway
[J]. Tunnel Construction, 2021, 41(5): 697-712.
|
[13] |
ZHANG Jichao, ZHOU Jianjun, SUN Feixiang, YANG Zhenxing, ZHANG Bing, YOU Huijie.
Risk Assessment on Underwater Docking Construction of
Shield Tunnel and
Mined Tunnel of Subsea Section on Xiamen Metro Line No. 3
[J]. Tunnel Construction, 2021, 41(2): 225-231.
|
[14] |
DU Baoyi, SONG Chaoye, HE Weiguo.
Application Analysis of Auxiliary Technologies for
Subsea Tunnel Shield Chamber Intervention in Case of
Abnormal Cutter Abrasion: a Case Study on Subsea
Tunnel Project of Xiamen Metro
[J]. Tunnel Construction, 2020, 40(S1): 374-381.
|
[15] |
WU Zhongshi, HE Zuhao, LIU Wen, XU Chao, KONG Qian.
Torsionresistant Construction Technology
for Steel Sleeve Used in Launching of Largediameter
Slurry Shield:
a
Case Study of Canapuri River Tunnel in Bangladesh
[J]. Tunnel Construction, 2020, 40(S1): 321-326.
|