| [1] |
LIU Qingzheng YANG Yandong, LU Gaoming, YAN Renfu, ZHANG Yongming, ZHU Xiaoliang, LI Enlei, LIU Wenshuai, WANG Junli, LIU Qiang, YAO Xiaomin, ZHAI Chaojie.
Optimization of Advance Pipe Roof Support Parameters for TBM Tunnels Based on Response Surface Methodology and Genetic Algorithms
[J]. Tunnel Construction, 2026, 46(S1): 443-455.
|
| [2] |
HU Bin, XING Yonghui, WANG Honggang.
Overall Design Scheme of Shayuzhou Tunnel in Guangzhou, China
[J]. Tunnel Construction, 2026, 46(8): 1762-1774.
|
| [3] |
ZHANG Shishu, DENG Xingfu, CHENG Lijuan, LU Wei, JIANG Zhongming, YANG Xue, LIU Chenzhi, HUANG Xiangyi, LIAO Junhui, SHI Zhaofeng, XIAO Ningning, YIN Chonglin.
Reconstruction Method of Idle Hydropower Caverns for Compressed Air Energy Storage
[J]. Tunnel Construction, 2026, 46(7): 1533-1545.
|
| [4] |
ZHU Yanfei, JI Maojie, YU Ning, GUO Yan, PAN Weiqiang, ZHU Ling.
Research and Application of Active Control Press-in Prefabricated Shaft Construction Method in Urban Core Area With Soft Soils
[J]. Tunnel Construction, 2025, 45(S2): 1-10.
|
| [5] |
YAO Hongzhi, WANG Han, BAI Dongfeng, SHI Baotong, ZHENG Wankun, ZHANG Caifei, HAN Xingbo.
Comparative Analysis of Construction Excavation Schemes and Support Parameters for Ultra-Large-Span Underground Storage Tank Space
[J]. Tunnel Construction, 2025, 45(S2): 289-301.
|
| [6] |
FANG Xin, LIU Shannan, PENG Xiajun.
Strata Deformation Caused by Construction of Prefabricated Suspended Sinking Shafts in Soft Soil Areas: A Case Study of a Working Shaft of a Connecting Pipe
in Shanghai, China
[J]. Tunnel Construction, 2025, 45(3): 567-578.
|
| [7] |
ZENG Luping, WANG Wei, HONG Jinxiang, ZHAO Shuang, RAN Qianping, CHEN Junsong, TIAN Jia.
Early Mechanical Strength and Water Penetration
Resistance Test of Tunnel Shotcrete Based on FullSection
Construction Method
[J]. Tunnel Construction, 2023, 43(S2): 281-288.
|
| [8] |
GUO Haizhu, ZHANG Jian, SHI Xiaowei.
Crucial Construction Technologies for Shenzhen Metro
Dayun Hub Station
[J]. Tunnel Construction, 2023, 43(S1): 451-456.
|
| [9] |
ZHANG Xiaodong, WU Quande, FAN Yongzai, LIU Dagang, WANG Yan, LUO Jia.
Mechanized Rapid Operation of Complete Sets of
Equipment in Large CrossSection Tunnels
[J]. Tunnel Construction, 2023, 43(S1): 416-424.
|
| [10] |
YANG Wentao, LIU Xiabing, HE Shaohui, ZHANG Xiaohua, WANG Jianjun.
Construction Method and Excavation Response of ShallowBuried SuperLargeSpan
FourTrack HighSpeed Railway
Tunnel: a Case
Study of Xiabeishan No. 1 Tunnel on HangzhouTaizhou
HighSpeed Railway
[J]. Tunnel Construction, 2022, 42(S2): 381-388.
|
| [11] |
ZHANG Zaichen, LIN Congmou, LI Jiasheng, DONG Yi, SHEN Yawen.
Development Status and Prospect of Highway Tunnel
Rehabilitation and Expansion in China
[J]. Tunnel Construction, 2022, 42(4): 570-585.
|
| [12] |
LEI Shengxiang, HUANG Shuanglin.
Disturbance Mechanism and Control Technology of
Underground Space Crossing underneath Buildings
(Structures)
[J]. Tunnel Construction, 2022, 42(1): 1-8.
|
| [13] |
LIN Kefu, XIANG Yanyong.
Numerical Modeling and Parametric Optimization of
ThreeBench Construction
Method for Zhengpantai Deep Tunnel in WaterRich Rocks
[J]. Tunnel Construction, 2021, 41(S1): 199-.
|
| [14] |
PAN Wentao, WU Fangyin, HE Chuan, LIU Yang, XIE Jinchi, KOU Hao, YANG Wenbo, ZENG Jie, YANG Song.
Construction Methods and Asymmetric Design
Optimization for ShallowBuried
Tunnels Subjected to Unsymmetrical Loads
[J]. Tunnel Construction, 2021, 41(S1): 352-.
|
| [15] |
QING Weichen, ZHU Yong, ZHANG Huijian.
Research on Mechanical Characteristics of Anchor Bolts
of Shallow buried Four Track
Railway Station Tunnel
[J]. Tunnel Construction, 2021, 41(5): 749-757.
|