| [1] |
YANG Ping, LI Jinghao, ZHANG Ting.
Application Status and Prospects of Artificial Ground Freezing Technology in China
[J]. Tunnel Construction, 2026, 46(5): 895-918.
|
| [2] |
ZHANG Junru, CHEN Pengtao, WANG Lichuan, WANG Wen, HE Weiguo, JIANG Xinqiang, HUANG Linxiang, PAN Tong.
A Support Parameter Optimization Method for Arch-Cover Method of Mined Metro Stations Based on Displacement Prediction
[J]. Tunnel Construction, 2026, 46(2): 260-272.
|
| [3] |
ZHAO Jingwei, LI Haoqi, SUN Yu.
Evaluation of Spatial Integration in Metro Station Areas From Perspective of Urban Renewal: A Case Study of Shinan District, Qingdao, China
[J]. Tunnel Construction, 2026, 46(1): 46-59.
|
| [4] |
LEI Mingfeng, LI Changwan, YANG Pengliang, JIA Chaojun, LI Chuitian.
Impact Zoning of Construction Disturbance on Nearby Existing Damaged BuildingsInduced by Foundation Pit of a Metro Station Based on Extended Finite Element Method and Response Surface Method
[J]. Tunnel Construction, 2026, 46(1): 69-79.
|
| [5] |
BAI Qian, LI Zheng, ZHAO Wen, PENG Zhipeng.
Impact of Small Pipe-Roof-Top Slab Method Support Parameters in Metro Stations on Surface Settlement
[J]. Tunnel Construction, 2026, 46(1): 103-112.
|
| [6] |
FENG Jimeng, LI Yifei, YAO Shiyu, WANG Shengtao, ZHANG Junru, SUN Ning.
Interactive Influence and Deformation Control of Construction Timing in Pile-Beam-Arch Method Metro Stations With Tunnel-Before-Station Sequence
[J]. Tunnel Construction, 2026, 46(1): 183-193.
|
| [7] |
ZHANG Zhiguo, WAN Qimeng, LI Junjie, NI Yin, JIA Haoran, WEI Jian.
Impact of Deep Foundation Pit Excavation on Existing Metro Stations in Rheological Soft Strata and Reinforcement Effects: A Case Study of Shanghai Jinqiao Metro Over-Track Project
[J]. Tunnel Construction, 2025, 45(S2): 97-106.
|
| [8] |
FANG Qian, YOU Qizhao, WANG Jianchen, WANG Gan, KE Chengjian, RU Zhenhua.
Deformation of Existing Metro Structures Induced by Newly Built Metro Undercrossing: A Case Study of 18 Newly Built Metro Projects in Beijing
[J]. Tunnel Construction, 2025, 45(S2): 125-139.
|
| [9] |
LIU Xiaogang, SONG Yi, GUO Yanhai, YAO Xilei.
Design of Common Structure Section Between Jinan-Binzhou High-Speed Railway Tunnel and Airport
[J]. Tunnel Construction, 2025, 45(S2): 280-288.
|
| [10] |
FU Lei, WU Huiming, HUANG Hongwei, ZHANG Dongming, CHEN Gang, LI Zhanglin.
Settlement Prediction and Construction Parameters
Optimization Induced by Shield Tunneling Based on Random Forest and Multi-Objective Particle Swarm
Optimization Algorithm-Crowding Distance
[J]. Tunnel Construction, 2025, 45(S1): 318-329.
|
| [11] |
XU Youjun, JIN Chenyu, ZHANG Chao, WANG Nan.
Optimization of Counteracting Soil of Parameters a Deep Foundation Pit Close to an Existing Station in Hohhot, China
[J]. Tunnel Construction, 2025, 45(9): 1728-1741.
|
| [12] |
LI Peng, WANG Quansheng, YU Changyi, FU Zeng.
Construction Technology of Metro Stations Using Triple-Circular Shield
[J]. Tunnel Construction, 2025, 45(9): 1756-1767.
|
| [13] |
LI Fangzheng, DING Hang, GAO Wei, LIU Wei, JIANG Haoliang, YE Yuxi, FANG Liangwen.
Integrated Control Technology and Application of Frost Heave for Shallow Underground Metro Station by Artificial Ground Freezing Method
[J]. Tunnel Construction, 2025, 45(7): 1353-1360.
|
| [14] |
HONG Chengyu, LI Hong, RAO Wei, CHEN Xiangsheng, LEI Zhen.
Fiber Optics Monitoring and
Crack Identification of Large-Scale Components in Prefabricated Metro Stations
[J]. Tunnel Construction, 2025, 45(3): 499-510.
|
| [15] |
ZHANG Jianwei, ZHANG Peng, WANG Jiaqing, CUI Tao, CHEN Jian, XING Jianjun, XIE Tingwei, NIU Yuzhe.
Experimental Study on
Mechanical Properties of Lapped Joints for Distributed Reinforcement Bars in Prefabricated Steel Cages Used in Open-Cut Station
[J]. Tunnel Construction, 2025, 45(3): 521-531.
|