ISSN 2096-4498
CN 44-1745/U
Tunnel Construction ›› 2011, Vol. 31 ›› Issue (5): 555-558.
• wenzhang • Previous Articles Next Articles
ZHANG Tao
Received:
Revised:
Online:
Published:
Abstract: Secondary cleaning must be made for the boreholes of castinsitu bored piles in soft subsoil before underwater concrete is cast, because the thickness of the mucks on the bottom of the boreholes always exceeds the limit values specified in relevant specifications. Taking the construction of the bored piles of a tunnel in Shunde, China as an example, the author determines to adopt the slurry replacement method in the secondary cleaning of the boreholes of the bored piles. The author studies on the optimum duration of the secondary cleaning of the boreholes and achieves the empirical formula to calculate the secondary borehole cleaning duration. This paper can provide guidance for the secondary cleaning of boreholes of castinsitu soft bored piles in soft subsoil in the future.
Key words: subsoil, bored pile made by normal circulation, secondary borehole cleaning
张涛. Secondary Cleaning Technology of Boreholes Made by Normal Circulation[J]. Tunnel Construction, 2011, 31(5): 555-558.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://www.suidaojs.com/EN/
http://www.suidaojs.com/EN/Y2011/V31/I5/555