| [1] |
ZHAO Xiaoyong, LI Guoliang, WANG Xindong, GAO Xinqiang, XIONG Wei, GUO Xiansuo.
Mechanical Properties of Prefabricated Inverted Arch Structures in Railway Tunnels During Construction
[J]. Tunnel Construction, 2026, 46(4): 828-839.
|
| [2] |
FANG Qian, YOU Qizhao, WANG Jianchen, WANG Gan, KE Chengjian, RU Zhenhua.
Deformation of Existing Metro Structures Induced by Newly Built Metro Undercrossing: A Case Study of 18 Newly Built Metro Projects in Beijing
[J]. Tunnel Construction, 2025, 45(S2): 125-139.
|
| [3] |
YAO Hongzhi, WANG Han, BAI Dongfeng, SHI Baotong, ZHENG Wankun, ZHANG Caifei, HAN Xingbo.
Comparative Analysis of Construction Excavation Schemes and Support Parameters for Ultra-Large-Span Underground Storage Tank Space
[J]. Tunnel Construction, 2025, 45(S2): 289-301.
|
| [4] |
HUANG Shuhua.
Key Construction Technology and Application Practice
of Mechanized Connecting Passage of a Super-Large Diameter Shield Tunnel in Complex Water-Rich Strata
[J]. Tunnel Construction, 2025, 45(S1): 280-289.
|
| [5] |
ZHANG Qian , LU Zhiwang, CUI Ding, ZHAO Wei, YE Youlin, SHANG Shijian.
Calculation of Ultimate Passive Support Pressure on Tunnel Face of Shield Tunnel Crossing Underneath Existing Pipeline in
Sandy Stratum
[J]. Tunnel Construction, 2025, 45(6): 1112-1119.
|
| [6] |
QI Chenglong.
BIM Modeling Method for Lining Structures of Mountain-Crossing Railway Tunnels Using BIMBase
[J]. Tunnel Construction, 2025, 45(6): 1171-1179.
|
| [7] |
TAO Weiming, CHEN Yang, PU Song, CAO Linwei, LIU Baolin, KUANG Wentao.
Scheme Design and Key
Technology of Yangtze River Tunnel of Chongqing-Hunan High-Speed Railway in Chongqing, China
[J]. Tunnel Construction, 2025, 45(6): 1219-1228.
|
| [8] |
PENG Wenbo, GAO Xiang, LIU Jiguo, ZHENG Cong, JIAN Yilin.
Key Technologies for Super-Long
Highway Tunnels in Very Cold and High-Altitude Regions: A Case Study on Shengli Tunnel
Crossing Tianshan Mountain in Xinjiang, China
[J]. Tunnel Construction, 2025, 45(5): 1027-1040.
|
| [9] |
WEI Gang, CAI Haoran, QI Yongjie, FENG Guohui, XU Tianbao.
Influence of Confining Pressure Change Caused by
Shield Undercrossing on Existing Shield Tunnels
[J]. Tunnel Construction, 2025, 45(4): 708-718.
|
| [10] |
WANG Jian, CHEN Weitao, HUANG Peng, WU Xuezhi, YU Li, WANG Xue, LIU Yuan, LI Junqi, WANG Song.
Design Parameters for
Pedestrian Crossing in External Traffic
Spiral Tunnels of Hydropower Engineering
[J]. Tunnel Construction, 2025, 45(1): 186-198.
|
| [11] |
ZHANG Yaoping.
Route Schemes of Seabed
Vacuum Tube Transport through Qiongzhou Strait
[J]. Tunnel Construction, 2024, 44(S1): 16-24.
|
| [12] |
TAO Zhigang, LIN Weijun, LI Yong, SUN Yingying, XIONG Yiwen, CHEN Mingliang.
Control Technology of
Negative Poisson′s Ratio Anchor Cable for Large Deformation Tunnel Across Faulted Soft Rocks
[J]. Tunnel Construction, 2024, 44(S1): 113-123.
|
| [13] |
XIAN Guo, ZOU Yongmu, LI Xiaobing, WANG Guan, WANG Yangyang.
Integrated Application and
Some Issues of Modern Tunneling Technology
for Chengdu-Kunming Railway Tunnel
[J]. Tunnel Construction, 2024, 44(8): 1713-1722.
|
| [14] |
XU Yulin, DI Xiaoyong, GONG Wen, LIN Zhi, LI Zheyu, YANG Hongyun.
Failure Mechanical Behaviors and Safety Thickness of Reserved Rock Walls in Coal Seam Tunnels
[J]. Tunnel Construction, 2024, 44(1): 126-138.
|
| [15] |
WEI Lixin, YANG Chunshan, LIU Liying, FU Dongliang.
General Design Scheme of Haizhu Bay RiverCrossing
Tunnel
[J]. Tunnel Construction, 2023, 43(S2): 359-368.
|