| [1] |
LUO Feng.
Karst Characteristics and Geological Route Selection for Tunnels in Southern Foothills of Eastern Qinling Mountains Along Xi’an-Shiyan High-Speed Railway
[J]. Tunnel Construction, 2026, 46(8): 1740-1749.
|
| [2] |
HU Bin, XING Yonghui, WANG Honggang.
Overall Design Scheme of Shayuzhou Tunnel in Guangzhou, China
[J]. Tunnel Construction, 2026, 46(8): 1762-1774.
|
| [3] |
HUANG Weiran, LUO Shuyi, JU Shijian, ZHU Weibin.
Engineering Practice and Innovation in Shield Tunneling Through Pearl River Delta Water System
[J]. Tunnel Construction, 2026, 46(8): 1800-1824.
|
| [4] |
LIU Yuanxi, HU Wei, JI Wendong, CHENG Shaozhen, LI Yinping, MA Hongling, SHI Xilin, WU Yubin.
Evaluation Index System and Convenient Method for Site Selection of Artificial Cavern-Based Compressed Air Energy Storage Power Stations
[J]. Tunnel Construction, 2026, 46(7): 1471-1482.
|
| [5] |
YAN Xiao, ZHANG Yazhou, YAO Zhanhu, ZHANG Dongmei, ZHANG Lei, XU Mingyuan, ZHOU Wending, LIANG Yuqiang, LU Mingfei, LI Hui.
Comparison and Selection of Structural Schemes for Underground Shield Docking in High-Water-Pressure Saturated Sandy Stratum and Its Engineering Application
[J]. Tunnel Construction, 2026, 46(6): 1330-1341.
|
| [6] |
YANG Guihua, ZHANG Chaoyu, ZENG Meiting, LU Xuantong, HE Xin, HE Shiyong, GAN Jin.
Multi-Objective Optimization of Drill-and-Blast Tunnel Machinery Under Constraint of Surrounding Rock Grades
[J]. Tunnel Construction, 2025, 45(S2): 163-173.
|
| [7] |
LI Jianxin, ZHANG Jixun, MA Jia, REN Xuhua, ZHANG Yuxian, DENG Zi′ang.
Optimizing Initial Geostress Field Inversion Using Least Absolute Shrinkage and Selection Operator-Ordinary Least Squares Method
[J]. Tunnel Construction, 2025, 45(9): 1698-1710.
|
| [8] |
XU Huaguo.
Experimental Study on Shield Cutting Prestressed Reinforced Concrete Pipe Piles
[J]. Tunnel Construction, 2025, 45(9): 1782-1790.
|
| [9] |
TAO Weiming, CHEN Yang, PU Song, CAO Linwei, LIU Baolin, KUANG Wentao.
Scheme Design and Key
Technology of Yangtze River Tunnel of Chongqing-Hunan High-Speed Railway in Chongqing, China
[J]. Tunnel Construction, 2025, 45(6): 1219-1228.
|
| [10] |
WU Fan, GONG Qiuming, LI Zhigang, HUANG Liu, XIE Xingfei, JIANG Zhiwei.
Tunneling Performance Comparison Between EPB/TBM Dual-Mode Shields
and Composite Shields in Rock Strata
[J]. Tunnel Construction, 2025, 45(5): 1009-1017.
|
| [11] |
LIU Hao, LI Peiqing, HUANG Meiqun.
Research and Application of Prefabricated Stations on Qingdao Metro Line 6
[J]. Tunnel Construction, 2025, 45(3): 604-612.
|
| [12] |
CHEN Weile, WANG Yuanqing, SUN Chunhua, ZHANG Qinbo, LI Xiaoming, CHEN Lin.
Structural Selection and Application of Immersed Tube Tunnel Elements Based on Entropy Weight Method-TOPSIS Approach
[J]. Tunnel Construction, 2025, 45(12): 2343-2351.
|
| [13] |
HU Min, ZHAO Pengpeng, WU Bingjian.
Optimization of Key
Assembly Points of Universal Segment of a Shield
Tunnel Under Complex Construction Conditions
[J]. Tunnel Construction, 2025, 45(1): 77-84.
|
| [14] |
QI Chun, YU Yu, PANG Tao, LIU Jinsong, TIAN Siming, WANG Chuang, LUO Lusen.
General Design Scheme For
Shu′an Tunnel of Chengdu-Chongqing Midline Railway
[J]. Tunnel Construction, 2024, 44(S2): 391-398.
|
| [15] |
DU Lijie, HAO Hongda, YANG Yalei, LI Qingwei, ZHANG Weidong, LIU Jiayi, FENG Hongchao, JIA Lianhui.
Tunnel Boring Machine Selection and Tunneling Attitude
Control Method for Tunnels With Small Turning Curves
[J]. Tunnel Construction, 2024, 44(5): 1106-1115.
|