| [1] |
ZHENG Guangyi, HAN Zefeng, SHI Yunfang, HE Yilin, KONG Jilong, CHU Zhaofei.
Drilling Sequence Optimization for Multiple Multi-Boom Rock Jumbos Based on Non-Dominated Sorting Genetic Algorithm
[J]. Tunnel Construction, 2026, 46(4): 840-851.
|
| [2] |
HU Junwei.
Composite Rock Fragmentation Technology Using Blasting Presplitting and Disc Cutters for Highly Intact and Extremely Hard Rock
[J]. Tunnel Construction, 2026, 46(2): 394-405.
|
| [3] |
ZHU Ying, LI Jianbin, CAO Chenxu, NIAN Junjie, YOU Weixing.
Novel Cutterhead Design for Cantilever TBMs
[J]. Tunnel Construction, 2025, 45(S2): 365-370.
|
| [4] |
WANG Mengmeng, FAN Lei, SUN Yingjie, CHEN Jiahao.
Key Technologies of Pipe Jacking Machines for Extra-Long Distance Hard Rocks and Their Application
[J]. Tunnel Construction, 2025, 45(S1): 351-360.
|
| [5] |
YI Xiaojun, SONG Zifan, LI Yang, LI Jiacheng, ZHANG Zhongjie, ZHANG Chunhui, LIU Jingsheng, FENG Lihua, LYU Xiangfeng.
Experimental Investigation of Jet Oscillation for Reducing Jacking Resistance Caused by Muck Accumulation in Hard Rock Pipe Jacking
[J]. Tunnel Construction, 2025, 45(8): 1483-1493.
|
| [6] |
ZHAO Guangzi, LI Kejin, LI Chunlin, QIU Hui, MA Yue, WANG You.
Vibration Response Patterns of Adjacent Single Piles Induced by Shield Tunneling
[J]. Tunnel Construction, 2025, 45(2): 295-303.
|
| [7] |
WU Senyang, CHEN Xiang, CHEN Peng, ZENG Yuhan.
Construction Risk Control
of Large-Section, Small-Spacing Rectangular Pipe-Jacking Metro Stations: A Case Study of Haibang
Metro Station in Guangzhou, China
[J]. Tunnel Construction, 2025, 45(2): 382-391.
|
| [8] |
ZHU Jie, YANG Chen, CUI Meng, FU Yueyou, JIA Hongyan, HAN Mengmeng.
Surrounding Rock Stability
of Main Caverns of Underground Water-Sealed Cavern Based on Safety Factor
[J]. Tunnel Construction, 2024, 44(S2): 179-191.
|
| [9] |
LIU Hongzhi, CAO Yinggui, DAI Zhenyang, SUN Shuliang.
Selection and Targeted Design of CrossSea
Ultralarge Diameter Slurry Shield Tunneling Through
Various Typical Strata: A Case Study of Jiaozhou Bay
Second Submarine Tunnel in Qingdao, China
[J]. Tunnel Construction, 2024, 44(4): 793-800.
|
| [10] |
XIE Wenda, LIANG Hongbing, CHEN Qiaosong, GUO Yongshun, MA Jingzhe.
Tunneling Technology of Three-Mode
Tunnel Boring Machine Under TBM Mode in Full-Section Hard Rock
[J]. Tunnel Construction, 2024, 44(3): 596-604.
|
| [11] |
ZHENG Jiaxing, JIA Haolin, PEI Chengyuan, DU Lijie, LI Qingwei, SONG Wenxue, TANG Rong.
Comparative Testing and Analysis of Onsite Performance
of Narrow and Conventional Disc Cutters in Tunnel Boring Machines
[J]. Tunnel Construction, 2024, 44(2): 360-367.
|
| [12] |
CHEN Yu.
Construction Technology and Improvement of
"Coring + Splitting" NonExplosive Method for Hard Rock Water Releasing Tunnel
[J]. Tunnel Construction, 2023, 43(S1): 443-450.
|
| [13] |
TAN Lei, JIANG Xiaoyi, HU Xiongwu, XU Hu.
Simulation and Application of Wenner AMN & MNB
Joint Inversion Imaging in Concealed Soft and Hard Rock Contact
Zone
[J]. Tunnel Construction, 2023, 43(9): 1501-1510.
|
| [14] |
LIU Xidong.
Microdisturbance Construction Control Technology for SmallSpacing Rectangle Jacking Tunnels with Large Section: A Case Study of Songhu RoadSanmen Road
Underpass Project
[J]. Tunnel Construction, 2023, 43(9): 1590-1604.
|
| [15] |
QI Zhichong, LYU Dan, HE Fei, XU Guangyi.
Carrying and Application of Water Jet CutterAssisted
Rock Breaking Technology
[J]. Tunnel Construction, 2023, 43(8): 1404-1412.
|