Tunneling Technology of Three-Mode Tunnel Boring Machine Under TBM Mode in Full-Section Hard Rock

XIE Wenda1, LIANG Hongbing1, *, CHEN Qiaosong1, GUO Yongshun2, MA Jingzhe3   

  1. (1. Guangzhou Metro Engineering Consulting Co., Ltd., Guangzhou 510010, Guangdong, China; 2. Guangzhou Metro Construction Management Co., Ltd., Guangzhou 510330, Guangdong, China; 3. The 3rd Engineering Co., Ltd. of China Railway Tunnel Group, Guangzhou 510530, Guangdong, China)

  • Online:2024-03-20 Published:2024-04-28

Abstract: In this study, a detailed analysis is conducted on the shield section project from Luogang station to Shuixi station of the Phase Ⅱ of the Guangzhou metro line 7.  The tunneling technology employed by the threemode tunnel boring machine in fullsection hard rock under TBM mode is examined. Furthermore, various aspects, including mucking mode, driving parameter control, cutter management, and stabilizer application, are evaluated. Results reveal the following key points: (1) Using toothed disc cutters in the threemode tunnel boring machine results in lower cutter consumption compared to smooth disc cutters, accompanied by reduced cutterhead torque. (2) The implementation of mud circulation and doublechannel mucking via screw conveyors substantially minimizes mud pipe blockage issues and enhances mucking efficiency. (3) Strategically positioned stabilizers and grippers on the front and middle shields, respectively, ensure shield body stability during boring operations in hard rock strata. (4) Optimal operation parameters for tunneling in fullsection hard rock strata include a cutterhead rotation speed of 3.0 r/min, total thrust force of 15 000 kN, thrust speed of 1 300 kN·m, and torque of 812 mm/min.

Key words: rail transit, three-mode tunnel boring machine, hard rock section, tunneling efficiency, fullsection rock stratum