ISSN 2096-4498
CN 44-1745/U
Tunnel Construction ›› 2012, Vol. 32 ›› Issue (6): 763-766.DOI: 10.3973/j.issn.1672-741X.2012.06.002
• wenzhang • Previous Articles Next Articles
YANG Xiuquan
Received:
Revised:
Online:
Published:
Abstract: Safety management and risk prevention exist in the whole course of the construction of shieldbored tunnels under complex geological conditions. The key points of safety management and risk prevention of rivercrossing shieldbored tunnel on line 2 of Wuhan Metro are discussed in term of geological conditions, environment investigation, shield type selection and detailed functional design, construction program determination and optimization, risk control, standardized construction and control and test of key construction points.
Key words: complex geology, shield tunneling, safety management, risk prevention
YANG Xiuquan. Safety Management and Risk Prevention in Shield Tunneling under Complex Geological Conditions[J]. Tunnel Construction, 2012, 32(6): 763-766.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://www.suidaojs.com/EN/10.3973/j.issn.1672-741X.2012.06.002
http://www.suidaojs.com/EN/Y2012/V32/I6/763