| [1] | HAN Xianmin, XIAO Mingqing, LI Wenjiang, ZHU Yongquan. 
														
															Influence of Multipipe Jacking of Pipe CurtainStructure Method on Settlement of Platform and Track of Railway Station
														[J]. Tunnel Construction, 2020, 40(2): 170-178. | 
																																																																																
													| [2] | JIANG Guojing, LI Fangzheng, ZHOU Xiaomin. 
														
															Application of Inclinometer Technology of Fiber Optic Gyroscope with Near-Horizontal Freezing Hole 
														[J]. Tunnel Construction, 2020, 40(1): 114-119. | 
																																																																																
													| [3] | XU Jinbin, WANG Feng, FU Cong, SONG Wei. 
														
															Combined Application of Cement System and Vertical Ground Freezing to Shield Receiving in Wuhan Metro
														[J]. Tunnel Construction, 2019, 39(S2): 358-365. | 
																																																																																
													| [4] | ZHANG Junru, YAN Congwen, YE Lun, WANG Anhui, ZHAO Zijing, FENG Jimeng. 
														
															Analysis of Mechanical Effect of Box Culvert Jacking on Bottom Pipe Curtain
														[J]. Tunnel Construction, 2019, 39(S1): 73-79. | 
																																																																																
													| [5] | XIONG Haoxiang, REN Hui, WENG Yuanlin. 
														
															Analysis of Construction Organization Scheme of Fivebench Fourteenstep Excavation Applied to Gongbei Tunnel
														[J]. Tunnel Construction, 2019, 39(2): 281-286. | 
																																																																																
													| [6] | MA Jun, HU Daoyun, YANG Ping. 
														
															Horizontal Freezing and Measurement Analysis of Plane Oblique Connection Gallery
														[J]. Tunnel Construction, 2019, 39(12): 1965-. | 
																																																																																
													| [7] | NIU Jie . 
														
															Application of Micro-disturbance Propulsion Construction Technology for Large Cross-section Box Culvert 
														[J]. Tunnel Construction, 2019, 39(11): 1905-. | 
																																																																																
													| [8] | CHEN Song. 
														
															Combined Application of Rodin Jet Pile Method and Freezing  Method to Shield Receiving End Soil
														[J]. Tunnel Construction, 2018, 38(6): 1037-1043. | 
																																																																																
													| [9] | DIAO Pengcheng, YANG Ping. 
														
															Application and Measurement of Secondary Consolidation by Liquid Nitrogen Freezing to Small Shield Receiving in Waterrich and Softweak Strata
														[J]. Tunnel Construction, 2018, 38(6): 1044-1051. | 
																																																																																
													| [10] | ZHANG Jie SHI Peixin, PAN Jianli. 
														
															Study of Ground Frost Heave Control Technology Used in Gongbei Tunnel Constructed by Pipe Roof and Ground Freezing Method
														[J]. Tunnel Construction, 2018, 38(5): 809-817. | 
																																																																																
													| [11] | YANG Xiaoping, LIN Peiqin, CONG Zhu, LIU Tingjin. 
														
															Numerical and Theoretical Analysis of Freezinginduced Water Leakage of Metro Shield Tunnel
														[J]. Tunnel Construction, 2018, 38(2): 176-182. | 
																																																																																
													| [12] | XU Liming, CHEN Xiaojian, PENG Zhengyong, ZHOU Jianjun. 
														
															Study of Health Monitoring Technology for Crosspassage in Subsea Tunnel Constructed by Freezing Method
														[J]. Tunnel Construction, 2018, 38(2): 295-299. | 
																																																																																
													| [13] | WU Zhen, GENG Chuanzheng, WANG Lei. 
														
															Underwater Receiving Technology of EPB Shield in  Waterrich Gravel Stratum
														[J]. Tunnel Construction, 2018, 38(12): 2040-2045. | 
																																																																																
													| [14] | ZHAO Wen, DONG Jiachao, JIA Pengjiao, SHI Jianjun, XIAO Junhang, LIU Qiang. 
														
															Study of Construction Technology of Steel Tube Slab Structure for Mined Metro Station
														[J]. Tunnel Construction, 2018, 38(1): 72-79. | 
																																																																																
													| [15] | MA Yue, LIAO Fang, ZHU Zhiwu, YANG Liu. 
														
															Analysis of Freezing Process of Artificial Frozen Soil and Calculation of  Spacing between Freezing Pipes
														[J]. Tunnel Construction, 2017, 37(8): 1011-1017. |