| [1] |
HU Bin, XING Yonghui, WANG Honggang.
Overall Design Scheme of Shayuzhou Tunnel in Guangzhou, China
[J]. Tunnel Construction, 2026, 46(8): 1762-1774.
|
| [2] |
ZHANG Shishu, DENG Xingfu, CHENG Lijuan, LU Wei, JIANG Zhongming, YANG Xue, LIU Chenzhi, HUANG Xiangyi, LIAO Junhui, SHI Zhaofeng, XIAO Ningning, YIN Chonglin.
Reconstruction Method of Idle Hydropower Caverns for Compressed Air Energy Storage
[J]. Tunnel Construction, 2026, 46(7): 1533-1545.
|
| [3] |
ZHU Yanfei, JI Maojie, YU Ning, GUO Yan, PAN Weiqiang, ZHU Ling.
Research and Application of Active Control Press-in Prefabricated Shaft Construction Method in Urban Core Area With Soft Soils
[J]. Tunnel Construction, 2025, 45(S2): 1-10.
|
| [4] |
FANG Xin, LIU Shannan, PENG Xiajun.
Strata Deformation Caused by Construction of Prefabricated Suspended Sinking Shafts in Soft Soil Areas: A Case Study of a Working Shaft of a Connecting Pipe
in Shanghai, China
[J]. Tunnel Construction, 2025, 45(3): 567-578.
|
| [5] |
LIANG Ganbo, YANG Baofeng, ZHU Xin.
Design and Practice of
Super-Large Span Tunnel for Shenzhen-Shantou Western Expressway Extension
Project
[J]. Tunnel Construction, 2024, 44(S1): 301-310.
|
| [6] |
QIAO Minglei, LI Sheng, ZHANG Jiangong, WANG Qicai, XUE Yanjin, CHEN Zhigang.
FiveStep Single SideDrift Method for Fenghuangshan SuperLarge CrossSection Loess Tunnel
[J]. Tunnel Construction, 2024, 44(5): 1096-1105.
|
| [7] |
ZENG Luping, WANG Wei, HONG Jinxiang, ZHAO Shuang, RAN Qianping, CHEN Junsong, TIAN Jia.
Early Mechanical Strength and Water Penetration
Resistance Test of Tunnel Shotcrete Based on FullSection
Construction Method
[J]. Tunnel Construction, 2023, 43(S2): 281-288.
|
| [8] |
GUO Haizhu, ZHANG Jian, SHI Xiaowei.
Crucial Construction Technologies for Shenzhen Metro
Dayun Hub Station
[J]. Tunnel Construction, 2023, 43(S1): 451-456.
|
| [9] |
ZHANG Xiaodong, WU Quande, FAN Yongzai, LIU Dagang, WANG Yan, LUO Jia.
Mechanized Rapid Operation of Complete Sets of
Equipment in Large CrossSection Tunnels
[J]. Tunnel Construction, 2023, 43(S1): 416-424.
|
| [10] |
QIAO Xiong, YANG Xin.
Current Situation and Development of Causes of
Secondary Lining Crack in
Loess Tunnel and Countermeasures
[J]. Tunnel Construction, 2023, 43(10): 1657-1676.
|
| [11] |
FENG Jimeng, TAN Yumei, YAO Shiyu, YAN Zhijian, ZHANG Junru, WANG Shengtao.
Deformation Control Mechanism of ShallowBuried
Cohesive Loess Tunnel and Related Countermeasures
[J]. Tunnel Construction, 2023, 43(10): 1712-1722.
|
| [12] |
YANG Wentao, LIU Xiabing, HE Shaohui, ZHANG Xiaohua, WANG Jianjun.
Construction Method and Excavation Response of ShallowBuried SuperLargeSpan
FourTrack HighSpeed Railway
Tunnel: a Case
Study of Xiabeishan No. 1 Tunnel on HangzhouTaizhou
HighSpeed Railway
[J]. Tunnel Construction, 2022, 42(S2): 381-388.
|
| [13] |
ZHAO Yan.
Stability Evaluation of Loess Tunnel during
Construction Based on Principal Component AnalysisCloud
Model
[J]. Tunnel Construction, 2022, 42(9): 1529-1536.
|
| [14] |
ZHANG Zaichen, LIN Congmou, LI Jiasheng, DONG Yi, SHEN Yawen.
Development Status and Prospect of Highway Tunnel
Rehabilitation and Expansion in China
[J]. Tunnel Construction, 2022, 42(4): 570-585.
|
| [15] |
LEI Shengxiang, HUANG Shuanglin.
Disturbance Mechanism and Control Technology of
Underground Space Crossing underneath Buildings
(Structures)
[J]. Tunnel Construction, 2022, 42(1): 1-8.
|