[1] |
XU Huaguo, CHEN Kui, SUN Zhenchuan.
Laboratory Test of Reinforced Concrete Pile Foundation Cutting by Shield Cutterhead
[J]. Tunnel Construction, 2020, 40(1): 35-42.
|
[2] |
ZHAI Qianzhi, ZHOU Jianjun, LI Hongbo, WANG Liming.
A Case Study on Double-shield TBM Disc Cutter Wear and Replacement Estimation
[J]. Tunnel Construction, 2019, 39(12): 2081-.
|
[3] |
QIN Yinping, ZHANG Zhuqing, SUN Zhenchuan, CHEN Kui, YANG Yandong.
Analysis and Prediction of TBM Disc Cutter Wear Based on Field Test
[J]. Tunnel Construction, 2019, 39(11): 1914-.
|
[4] |
YUAN Libin, LIU Jie, ZHAO Hong, YANG Zhiyong, XU Chao.
Wear Law and Life Prediction of Disc Cutter of Shield in Waterrich Pebble Drift Ground
[J]. Tunnel Construction, 2019, 39(10): 1712-1719.
|
[5] |
HUANG Tao, LIU Quansheng, HUANG Xing, ZHANG Xiaoping, LU Xinjing.
Research and Development of RealTime Monitoring System forScraper Wear and Laboratory Verification Experimental Test
[J]. Tunnel Construction, 2018, 38(S2): 364-373.
|
[6] |
Translator: ZHANG Jing;Original Authors: J. Kuepferle, A. Roettger, W. Theisen, M. Alber.
Wear Prediction for Softground Tunneling Tools: A New Approach Regarding Dominant Influencing Factors In Tribological System of Tunneling Tools
[J]. Tunnel Construction, 2018, 38(S1): 67-72.
|
[7] |
YANG Yu.
Prediction of Disc Cutter Wear of Shield Used in Seacrossing Section on Xiamen Rail Transit Line No. 3
[J]. Tunnel Construction, 2018, 38(S1): 182-187.
|
[8] |
ZHUO Xingjian, LU Yati.
Realtime Wear Monitoring System for Scrape Cutters and Tearing Cutters
[J]. Tunnel Construction, 2018, 38(6): 1060-1065.
|
[9] |
HUO Bin, XU Zhaohui, HU Xianglong, GUO Guibin.
Analysis of Technical Difficulties and Control Measures for Slurry Shield Boring in Sandy Cobble Strata: A Case Study of Yellow Rivercorssing Tunnel of Lanzhou Metro
[J]. Tunnel Construction, 2018, 38(5): 846-850.
|
[10] |
WANG Kai, CHEN Kui, SUN Zhenchuan, YANG Yandong, ZHAO Hailei, LI Xing.
Experimental Study of Disc Cutter Wear Based on Composite Abrasion Test Platform
[J]. Tunnel Construction, 2018, 38(1): 142-147.
|
[11] |
SUN Zhenchuan, YANG Yandong, CHEN Kui, LI Fengyuan, ZHANG Bing.
Study of Wear of Disc Cutter Boring in Monzonitic Granite Strata of Lingnan TBM Section of Hanjiang RiverWeihe River Water Conveyance Project
[J]. Tunnel Construction, 2017, 37(9): 1167-1172.
|
[12] |
SU Ming, LI Tong, HAN Aimin, JIN Lizhong, LIU Xuezhu.
Quantitative Prediction Method for Disc Cutter Wear Based on Specific Wear Index
[J]. Tunnel Construction, 2017, 37(7): 891-898.
|
[13] |
ZHANG Xiaobo, LIU Quansheng, ZHANG Jianming.
Realtime Monitoring Technology for Wear of Cutters and Monitoring and Analysis of Cutterhead Vibration of TBM
[J]. Tunnel Construction, 2017, 37(3): 380-385.
|
[14] |
LIU Zhaowei, WANG Baiquan, SHANG Wei.
Study of Wireless Detection System of Shield Cutter Wear Based on Ultrasonic
[J]. Tunnel Construction, 2017, 37(11): 1469-1474.
|
[15] |
SHEN Huiyu, ZHANG Weiwei, ZHANG Jianian.
Numerical Study of Soil Cutting by Shield Cutter under Different Structural Parameters
[J]. Tunnel Construction, 2016, 36(7): 881-886.
|