| [1] |
ZHAO Xiwang, XIA Wenjie, WANG Jihong, JIANG Shuang, WANG Shugang, WU Yuanjin, LUO Zhanfu, LIU Qijun.
Rapid Prediction of Pollutant Concentration in
Construction Tunnels
Based on Proper Orthogonal Decomposition
[J]. Tunnel Construction, 2025, 45(S1): 32-41.
|
| [2] |
LIU Xuezeng, FANG Maoliu, WU Dexing, LI Yinping, LIU Xingen, LI Gang.
Status and Development of Rapid Detection Technology for
Tunnel Structural Defects
[J]. Tunnel Construction, 2025, 45(4): 657-676.
|
| [3] |
ZHAO Guangping.
Rapid Construction
Technology of Controlled Blasting for Tunnels Crossing Underneath Urban Areas
[J]. Tunnel Construction, 2024, 44(S1): 368-380.
|
| [4] |
FU Jinyang, WANG Haoyu, XIE Jichen, ZHU Zhiheng, ZHANG Cong, WU Jun.
Rapid Detection Methods for
Seepage and Erosion Diseases in Hydraulic Tunnels Using Panoramic Image
[J]. Tunnel Construction, 2024, 44(10): 1971-1981.
|
| [5] |
ZHANG Xiaodong, WU Quande, FAN Yongzai, LIU Dagang, WANG Yan, LUO Jia.
Mechanized Rapid Operation of Complete Sets of
Equipment in Large CrossSection Tunnels
[J]. Tunnel Construction, 2023, 43(S1): 416-424.
|
| [6] |
XIE Jingyu, LI Huajian, WANG Zhen, HUANG Fali, YI Zhonglai.
A Rapid Evaluation Method for Saturated Compressive Strength
of Tunnel Muck Based on Point Load
[J]. Tunnel Construction, 2023, 43(7): 1161-1169.
|
| [7] |
TIAN Siming, WU Kefei, YU Li, LI Xu, GONG Jiangfeng, WANG Xindong.
Key Technology of AntiSeismic for Railway Tunnels Crossing Active
Fault Zone
[J]. Tunnel Construction, 2022, 42(8): 1351-1364.
|
| [8] |
ZHANG Rui, ZHOU Kaige, YAO Zhigang, FANG Yong, TANG Xie, ZHOU Xionghua.
Application Analysis of Key Construction Technology of
Micangshan SuperLong Highway Tunnel
[J]. Tunnel Construction, 2021, 41(S2): 664-674.
|
| [9] |
LIN Wei, LIANG Jiezhong, LIU Lingfeng, ZOU Wei, LIN Ming.
Development and Prospect of Immersed Tunnel and Artificial
Island Technology
[J]. Tunnel Construction, 2021, 41(12): 2029-2036.
|
| [10] |
WANG Bin, LI Cangsong, CAI Jianhua, SHI Yongyue, WANG Yanjie, ZHANG Tao.
Study of Correlation between Rock Leeb Hardness and
Uniaxial Saturated Compressive Strength
[J]. Tunnel Construction, 2020, 40(S2): 174-179.
|
| [11] |
WANG Liang.
Construction Technology of Largediameter
Pressure Steel Pipe Lining in Songhua River Water
Diversion Project
[J]. Tunnel Construction, 2020, 40(S1): 382-388.
|
| [12] |
ZHAO Shuang, HONG Jinxiang, QIAO Min, WANG Wei, ZENG Luping, ZHAO Bin.
Construction Test of Rapid Hardening Shotcrete in
Wushan Tunnel on ZhengzhouWanzhou Highspeed Railway
[J]. Tunnel Construction, 2020, 40(S1): 369-373.
|
| [13] |
DING Hao, LIAO Jun.
Design and Research of Tunnel Engineering Information Platform Based on BIM Technology
[J]. Tunnel Construction, 2019, 39(S2): 60-68.
|
| [14] |
QIN Feng.
Application and Development of Rapid Installation Technology for Pipelines in Shield Tunnel
[J]. Tunnel Construction, 2018, 38(S2): 298-302.
|
| [15] |
CHEN Xuwen, HUANG Lei, ZOU Yilun.
Rapid Construction Technology of Flexible Support for Rockburst Tunnel
[J]. Tunnel Construction, 2018, 38(7): 1212-1219.
|