| [1] |
WANG Shuangwang, YANG Bin, ZHONG Qingfeng, CHEN Liangwu.
Intelligent Fault Diagnosis of Low-Speed, Heavy-Load, Ultra-Large Rolling Bearings Using a Channel Attention Mechanism and a One-Dimensional Convolutional Neural Network
[J]. Tunnel Construction, 2026, 46(5): 985-993.
|
| [2] |
ZHU Yeting, ZHAO Jian, BI Xiangli, ZHU Yanfei, YU Ning, WANG Xiuzhi, HUANG Dezhong, QIN Yuan.
Engineering Verification of Parallel Control Technology for Automatic Shield Tunneling and Segment Assembly
[J]. Tunnel Construction, 2025, 45(8): 1602-1614.
|
| [3] |
ZHU Yeting, BI Xiangli, ZHU Yanfei, YU Ning, WU Di, QIN Yuan, WANG Zhihua, JIANG Haibo.
Retrofit and Engineering Practice of Automatic Tunneling Attitude Control for Existing Metro Shield Machines
[J]. Tunnel Construction, 2025, 45(7): 1378-1386.
|
| [4] |
LYU Haimin, LIU Xiang, HAN Kaihang, CHEN Xiangsheng, DONG Zijun, ZHANG Jiaxuan.
Assessment Methods and Perspectives on Extreme Rainfall-Induced Flood Risks in Urban Underground Spaces
[J]. Tunnel Construction, 2025, 45(11): 1981-1993.
|
| [5] |
WANG Jie, CHENG Guolong, ZHOU Bing, HU Wei, TAN Houjun, XIE Jianhong.
Safety Risk Evaluation of
Long-Distance Small-Diameter Tunnel Bored by Tunnel Boring
Machine
[J]. Tunnel Construction, 2024, 44(S2): 211-223.
|
| [6] |
LIU Chengwen, LIU Gang, XU Hua, DING Guopeng.
Mechanism and Risk
Assessment of Water and Mud Inrush in Water-Rich
Section With Tertiary Semi-Diagenetic
Sandstone and Mudstone in Wangjiazhai Tunnel
[J]. Tunnel Construction, 2024, 44(S1): 139-148.
|
| [7] |
QIN Yawei, TAN Yi, JU Wanglai, CHEN Bin.
Collapse Risk Assessment of Mountain Tunnels Based on
SetPair Analysis Theory and Digital Platform
[J]. Tunnel Construction, 2024, 44(3): 475-483.
|
| [8] |
PENG Shaoyong, FENG Shichun, XU Han.
Hazard Assessment Model for Water and Mud Inrush in Karst Tunnel Based on Interval Number Theory
[J]. Tunnel Construction, 2023, 43(S2): 100-106.
|
| [9] |
WU Cheng, ZHANG Bo, LEI Shasha, YANG Chuhan, LI Bin, LU Feng, ZHANG Junru.
Construction Risk Assessment of Shield Tunnel Crossing
Bridge Pile Foundation Group Based on FAHPGRA Method
[J]. Tunnel Construction, 2023, 43(S2): 186-196.
|
| [10] |
LIU Xingen, WANG Bozhi, LIU Xiaodi.
Track Deviation Correction Method of Shield Based on
Space S-Curves
[J]. Tunnel Construction, 2023, 43(S1): 457-463.
|
| [11] |
GUO Hongbin, SONG Zhanping, MENG Chen, WANG Junbao, LIU Naifei, GUO Desai.
Shield Tunneling Risk Assessment Based on Nonlinear Fuzzy Analytic Hierarchy Method
[J]. Tunnel Construction, 2023, 43(11): 1862-1871.
|
| [12] |
LI Gongyi.
Fault Analysis and Countermeasures for Screw Conveyor
of Earth Pressure Balance Shield Boring in LongDistance Hard Rock Section
[J]. Tunnel Construction, 2022, 42(S2): 502-507.
|
| [13] |
LIU Jiajun, YANG Guang, WANG Junjie, HAN Weifeng, CAI Jun, ZHAO Xiangbo.
Development and Application of Intelligent Grease
Monitoring Device for Shield Based on Phase Laser Sensor
[J]. Tunnel Construction, 2022, 42(S2): 525-532.
|
| [14] |
CHEN Qiankun.
EnlargingDiameter Modification of
Composite Cutterhead of Shield Based on ANSYS
[J]. Tunnel Construction, 2022, 42(S2): 533-540.
|
| [15] |
ZHU Yeting.
Model Test Verification of Synchronous Technology
Combining Shield Tunneling with Segment Assembling Based on Principle
of Uniform Loading on a Single Segment
[J]. Tunnel Construction, 2022, 42(5): 854-862.
|